| Location | Project/Study | Phase | Description |
| All Bryan District counties | Active Transportation | Preliminary Design | Planning and development of Active Transportation (bicycle and pedestrian facilities) in the ten-county Bryan District area. |
| 11 counties between Belton County to Walker County | I-14 Central Texas Corridor Study | Feasibility Study | A study to align the ongoing I-14 development and planning efforts to ensure consistency and continuity of the interstate corridor from west Texas to Louisiana. |
| Brazos County | Inner Loop Study East | Feasibility Study | A new proposed alignment connecting SH 6 east of FM 2818 in Bryan, cross SH 30 south of Elmo Weedon Road and connect with the William D Fitch Parkway in College Station. |
| Brazos County | SH 47 at SH 21 Interchange | Preliminary Design | The project would construct a new interchange to enhance safety, reduce congestion, maintain local connectivity and improve mobility at the SH 47 and SH 21 interchange. |
| Brazos County | FM 1688 (Leonard Road) Corridor Plan | Preliminary Design | Widening of FM 1688 (Leonard Road) from SH 47 to FM 2818 (Harvey Mitchell Parkway) in Brazos County, Texas. |
| Brazos County | SH 30 (Harvey Road) Corridor Plan | Preliminary Design | Widening of SH 30 (Harvey Road) from SH 6 to FM 158 in Brazos County, Texas. |
| Brazos County | FM 2154 (Wellborn Road) Widening | Preliminary Design | In collaboration with the city of College Station is proposing improvements to FM 2154 (Wellborn Road) from SH 40 (William D. Fitch Parkway) to Greens Prairie Road. |
| Brazos County | FM 1179 Widening | Preliminary Design | The project would widen FM 1179 from Easterling Drive to FM 158 (Boonville Road) in Brazos County, Texas. |
| Brazos County | FM 974 (Tabor Road) at SH 6 Intersection Modifications | Construction | Improvements to FM 974 at the SH 6 intersection from Shirley Drive to the SH 6 southbound frontage road in Brazos County, Texas. |
| Brazos County | Big 6 | Construction | Planning for improvements to SH 6 from US 190/SH 21 to SH 40/Willian D. Fitch. |
| Brazos County | FM 2347 Project | Design | Improvements to the intersection of George Bush Drive, Wellborn Road and the Union Pacific Railroad. |
| Brazos County | BS-6R (Texas Avenue) Improvements Project | Construction/Design | Development to improve safety and mobility along BS-6R (Texas Avenue) from Old Hearne Road to FM 60 (University Drive). |
| Brazos and Grimes counties | SH 30 at the Navasota River | Design | Proposed improvements to a 2.9-mile segment of SH 30 from 0.3 miles west of William D. Fitch Parkway to 2.6 miles east of William D. Fitch Parkway |
| Brazos and Robertson counties | US 190/SH 6 Alignment Study | Preliminary Design | Evaluate the feasibility options to improve this corridor's safety and mobility. |
| Burleson and Brazos counties | SH 21 Intersection Improvements | Design | Improvements to the intersections at FM 50 South, FM 50 North and OSR along SH 21. |
| Burleson County | FM 60 at the Union Pacific Bridge | Design | Proposal to improve FM 60 at the Union Pacific Bridge in Burleson County. |
| Freestone County | I-45 Fairfield | Construction | Improve traffic flow and safety of the frontage road along I-45 in the Fairfield area. |
| Grimes County | SH 105 Widening Project | Preliminary Design | Proposed improvements to reduce congestion, enhance safety, and improve regional mobility along the SH 105 corridor. |
| Grimes County | SH 6 and FM 2 Intersection | Construction | Proposing improvements to the intersection of SH 6 and FM 2. |
| Leon County | US 79 Leon County (Jewett to Buffalo) | Design | Increase capacity from a two-lane undivided roadway to a four-lane divided roadway. |
| Madison County | SH 21 West Madison County | Construction | Increase capacity from a two-lane undivided roadway to a four-lane divided roadway. |
| Madison County | SH 21 Relief Route Madisonville | Design | A relief route is being studied to increase mobility. |
| Robertson County | US 79 at the Little Brazos River | Construction | Replace the bridge over the Little Brazos River and provide improvements to US 79 in Hearne. |
| Robertson County | SH 6/US 79 Hearne Relief Route Study | Feasibility Study | Feasibility study on potential locations for a route to alleviate congestion and enhance safety around the City of Hearne in Robertson County, Texas. |
| Walker County | SH 19 Intersection Improvements | Preliminary Design | Improvement of various crossings along SH 19 from 4 miles south of FM 405 (near Sterling Chapel Road) to 3.6 miles north of SH 30 (near Louis Grant Road) in Walker County, Texas. |
| Walker County | New Waverly Transportation Study | Feasibility Study | Study transportation improvements in and around New Waverly. |
| Washington County | US 290 Improvements | Preliminary Design | Plans to improve various crossings along US 290 between FM 1371 and FM 577 in Washington County, Texas |
| Washington County | BS 36/ SH 36 Roadway Improvements | Preliminary Design | Enhance safety along BS 36J (also known as S Day Street) from W Stone Street to US 290 by replacing the existing center left-turn lane with raised medians and dedicated left-turn lanes at selected locations. |
| Washington County | US 290/SH 36 Interchange | Design - Build | Develop design concepts to improve the intersection of US 290/SH 36. |
| Washington County | US 290 Improvement Project - FM 1155 Intersection Study (Chappell Hill) | Construction (Interim Solution) / Preliminary Design (Long-Term Solution) | The purpose of the proposed widening project is to improve mobility and enhance safety within the project corridor. |