Bryan
Skip to main content
Explore projects

Browse projects in your area and find opportunities to get involved.

Explore projects

Bryan

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project/Study Description
All Bryan District counties Active Transportation Planning and development of Active Transportation (bicycle and pedestrian facilities) in the ten-county Bryan District area.
11 counties between Belton County to Walker County I-14 Central Texas Corridor Study A study to align the ongoing I-14 development and planning efforts to ensure consistency and continuity of the interstate corridor from west Texas to Louisiana.
Brazos County SH 30 (Harvey Road) Raised Medians The project would construct raised medians on SH 30 to enhance safety within this section of roadway.
Brazos County FM 2154 (Wellborn Road) Widening In collaboration with the city of College Station is proposing improvements to FM 2154 (Wellborn Road) from SH 40 (William D. Fitch Parkway) to Greens Prairie Road.
Brazos County FM 1179 Widening The project would widen FM 1179 from Easterling Drive to FM 158 (Boonville Road) in Brazos County, Texas
Brazos County FM 1179 (E Villa Maria Road and Briarcrest Drive) Raised Medians The project would construct raised medians on FM 1179 to enhance safety within this section of roadway.
Brazos County BS-6R (Texas Avenue) Improvements Project Development to improve safety and mobility along BS-6R (Texas Avenue) from Old Hearne Road to FM 60 (University Drive)
Brazos County SH 6 Central BCS Planning for improvements to SH 6 from US 190/SH 21 to SH 40/Willian D. Fitch
Brazos County FM 158 (William J. Bryan Parkway) Safety and mobility improvements for FM 158 (William J. Bryan Parkway) from SH 6 to BS 6-R (Texas Ave)
Brazos County FM 2347 Project Improvements to the intersection of George Bush Drive, Wellborn Road and the Union Pacific Railroad
Brazos County FM 2818 (Harvey Mitchell Parkway) Widening Project Increase capacity from a four-lane divided roadway to a six-lane divided freeway from University Drive (FM 60) to George Bush Drive (FM 2347)
Brazos and Robertson County US 190/SH 6 Alignment Study Evaluate the feasibility options to improve this corridor's safety and mobility
Burleson and Brazos Counties SH 21 Intersection Improvements Improvements to the intersections at FM 50 South, FM 50 North and OSR along SH 21
Burleson County FM 60 at the Union Pacific Bridge Proposal to improve FM 60 at the Union Pacific Bridge in Burleson County
Freestone County I-45 Fairfield Improve traffic flow and safety of the frontage road along I-45 in the Fairfield area
Grimes County SH 6 and FM 2 Intersection Proposing improvements to the intersection of SH 6 and FM 2
Grimes County SH 249 Project Identify potential route or routes between Todd Mission and Navasota
Leon County US 79 Leon County (Jewett to Buffalo) Increase capacity from a two-lane undivided roadway to a four-lane divided roadway
Madison County SH 21 West Madison County Increase capacity from a two-lane undivided roadway to a four-lane divided roadway
Madison County SH 21 Relief Route Madisonville A relief route is being studied to increase mobility
Milam County US 79 Rockdale Improvements Improvements to US 79 from 0.5 mile west of FM 487 (Erie Ave) to 0.2 mile east of Highway 77
Robertson County FM 50 and Union Pacific Railroad Intersection Improve safety at the intersection of FM 50 and the Union Pacific Railroad (UPRR) in Mumford
Robertson County US 79 at the Little Brazos River Replace bridge over Little Brazos River and provide improvements to US 79 in Hearn
Walker County I-45 Central Walker County Project Widen interstate to six lanes and other various improvements
Washington County BS 36J Raised Medians Enhance safety along BS 36J (also known as S Day Street) from W Stone Street to US 290 by replacing existing center left-turn lane with raised medians and dedicated left turn lanes at selected locations
Washington County US 290/SH 36 Interchange Develop design concepts to improve the intersection of US 290/SH 36
Washington County US 290 Improvement Project - FM 1155 Intersection Study (Chappell Hill) The purpose of the proposed widening project is to improve mobility and enhance safety within the project corridor.
Walker, Madison, Leon and Freestone counties I-45 Corridor Program Planning and development of safety and mobility improvements on more than 90 miles of I-45 through Walker, Madison, Leon and Freestone counties.