Bryan
Skip to main content

Bryan

Project and studies

LocationProject/StudyPhaseDescription
All Bryan District countiesActive TransportationPreliminary DesignPlanning and development of Active Transportation (bicycle and pedestrian facilities) in the ten-county Bryan District area.
11 counties between Belton County to Walker CountyI-14 Central Texas Corridor StudyFeasibility StudyA study to align the ongoing I-14 development and planning efforts to ensure consistency and continuity of the interstate corridor from west Texas to Louisiana.
Brazos CountyInner Loop Study EastFeasibility StudyA new proposed alignment connecting SH 6 east of FM 2818 in Bryan, cross SH 30 south of Elmo Weedon Road and connect with the William D Fitch Parkway in College Station.
Brazos CountySH 47 at SH 21 InterchangePreliminary DesignThe project would construct a new interchange to enhance safety, reduce congestion, maintain local connectivity and improve mobility at the SH 47 and SH 21 interchange.
Brazos CountyFM 1688 (Leonard Road) Corridor PlanPreliminary DesignWidening of FM 1688 (Leonard Road) from SH 47 to FM 2818 (Harvey Mitchell Parkway) in Brazos County, Texas.
Brazos CountySH 30 (Harvey Road) Corridor PlanPreliminary DesignWidening of SH 30 (Harvey Road) from SH 6 to FM 158 in Brazos County, Texas.
Brazos CountyFM 2154 (Wellborn Road) WideningPreliminary DesignIn collaboration with the city of College Station is proposing improvements to FM 2154 (Wellborn Road) from SH 40 (William D. Fitch Parkway) to Greens Prairie Road.
Brazos CountyFM 1179 WideningPreliminary DesignThe project would widen FM 1179 from Easterling Drive to FM 158 (Boonville Road) in Brazos County, Texas.
Brazos CountyFM 974 (Tabor Road) at SH 6 Intersection ModificationsConstructionImprovements to FM 974 at the SH 6 intersection from Shirley Drive to the SH 6 southbound frontage road in Brazos County, Texas. 
Brazos CountyBig 6ConstructionPlanning for improvements to SH 6 from US 190/SH 21 to SH 40/Willian D. Fitch.
Brazos CountyFM 2347 ProjectDesignImprovements to the intersection of George Bush Drive, Wellborn Road and the Union Pacific Railroad.
Brazos CountyBS-6R (Texas Avenue) Improvements ProjectConstruction/DesignDevelopment to improve safety and mobility along BS-6R (Texas Avenue) from Old Hearne Road to FM 60 (University Drive).
Brazos and Grimes countiesSH 30 at the Navasota RiverDesignProposed improvements to a 2.9-mile segment of SH 30 from 0.3 miles west of William D. Fitch Parkway to 2.6 miles east of William D. Fitch Parkway
Brazos and Robertson countiesUS 190/SH 6 Alignment StudyPreliminary DesignEvaluate the feasibility options to improve this corridor's safety and mobility.
Burleson and Brazos countiesSH 21 Intersection ImprovementsDesignImprovements to the intersections at FM 50 South, FM 50 North and OSR along SH 21.
Burleson CountyFM 60 at the Union Pacific BridgeDesignProposal to improve FM 60 at the Union Pacific Bridge in Burleson County.
Freestone CountyI-45 Fairfield ConstructionImprove traffic flow and safety of the frontage road along I-45 in the Fairfield area.
Grimes CountySH 105 Widening ProjectPreliminary DesignProposed improvements to reduce congestion, enhance safety, and improve regional mobility along the SH 105 corridor.
Grimes CountySH 6 and FM 2 IntersectionConstructionProposing improvements to the intersection of SH 6 and FM 2.
Leon CountyUS 79 Leon County (Jewett to Buffalo)DesignIncrease capacity from a two-lane undivided roadway to a four-lane divided roadway.
Madison CountySH 21 West Madison CountyConstructionIncrease capacity from a two-lane undivided roadway to a four-lane divided roadway.
Madison CountySH 21 Relief Route Madisonville DesignA relief route is being studied to increase mobility.
Robertson CountyUS 79 at the Little Brazos RiverConstruction Replace the bridge over the Little Brazos River and provide improvements to US 79 in Hearne.
Robertson CountySH 6/US 79 Hearne Relief Route StudyFeasibility StudyFeasibility study on potential locations for a route to alleviate congestion and enhance safety around the City of Hearne in Robertson County, Texas. 
Walker CountySH 19 Intersection ImprovementsPreliminary DesignImprovement of various crossings along SH 19 from 4 miles south of FM 405 (near Sterling Chapel Road) to 3.6 miles north of SH 30 (near Louis Grant Road) in Walker County, Texas.
Walker CountyNew Waverly Transportation StudyFeasibility StudyStudy transportation improvements in and around New Waverly.
Washington CountyUS 290 ImprovementsPreliminary Design Plans to improve various crossings along US 290 between FM 1371 and FM 577 in Washington County, Texas
Washington CountyBS 36/ SH 36 Roadway ImprovementsPreliminary DesignEnhance safety along BS 36J (also known as S Day Street) from W Stone Street to US 290 by replacing the existing center left-turn lane with raised medians and dedicated left-turn lanes at selected locations.
Washington CountyUS 290/SH 36 InterchangeDesign - BuildDevelop design concepts to improve the intersection of US 290/SH 36.
Washington CountyUS 290 Improvement Project - FM 1155 Intersection Study (Chappell Hill)Construction (Interim Solution) / Preliminary Design (Long-Term Solution)The purpose of the proposed widening project is to improve mobility and enhance safety within the project corridor.

I-45 Corridor Program projects

To improve safety and mobility along critical sections of Interstate 45 (I-45), TxDOT Bryan has begun planning improvements between Houston and Dallas.

I-45

LocationProject/StudyPhaseDescription
Walker, Madison, Leon and Freestone countiesI-45 Corridor ProgramOngoing DevelopmentPlanning and development of safety and mobility improvements on more than 90 miles of I-45 through Walker, Madison, Leon and Freestone counties.
Walker CountyI-45 Central Walker County Project (Segment 2A & 2B)Construction/DesignWiden interstate to six lanes and other various improvements.
Walker CountyI-45 North Walker County Project (Segment 3)Preliminary DesignUpdate the roadway to current design standards, increase its capacity to accommodate future traffic volumes, and improve access for local travelers.
Madison CountyI-45 South Madison County Project (Segments 4 and 5)Preliminary DesignUpdate the roadway to current design standards, increase its capacity to accommodate future traffic volumes, and improve access for local travelers.
Leon CountyI-45 Leon County Project (Segments 10 and 11)Preliminary DesignImprove safety and mobility along 90.4 miles of I-45 through Walker, Madison, Leon and Freestone counties.