Austin 2024
- 
    183A Added Capacity Project 
- 
    Austin District 2025-2028 Rural Transportation Improvement Program 
- 
    FM 812 from US 183 to SH 21 
- 
    FM 812 from US 183 to SH 21 - Notice of availability for finding of no significant impact (FONSI) 
- 
    I-35 Austin to San Antonio Link Study from SH 45 Southeast to CR 382 (Cibolo Valley Drive) 
- 
    I-35 Georgetown to Round Rock Project 
- 
    MoPac South 
- 
    Parmer Lane (FM 734) Corridor Study Open House 
- 
    RM 1826 Feasibility Study 
- 
    RM 1826 from US 290 to SH 45 
- 
    SH 21 from County Road to Old Highway 20 
- 
    SH 21 from SH 80 to SH 130 Schematic/Environmental Study 
- 
    SH 71 Safety Improvement Project 
- 
    US 183 from SH 29 to FM 963 Schematic/Environmental Study 
- 
    US 183 from SH 71 to SH 130 
- 
    US 281 at SH 71 Interchange 
- 
    US 281 Blanco relief route study 
- 
    US 290 from Oak Hill to Dripping Springs 
- 
    US 290 from Oak Hill to Dripping Springs 
- 
    US 290 Giddings Mobility Study 
- 
    Wirtz Dam Road Project