| Location | 
Project | 
Description | 
| Austin | 
Loop 360 - Capital of Texas Highway | 
Proposed upgrades on nine intersections to collectively provide substantial benefits for congestion relief | 
| Austin | 
MoPac South | 
Proposed improvements from Cesar Chavez Street to Slaughter Lane | 
| Austin | 
Oak Hill Parkway | 
Long-term mobility improvements to US 290 and SH 71 through Oak Hill | 
| Austin | 
RM 620 Projects | 
Improvements to RM 620 to SH 71 in Bee Cave to I-35 in Round Rock | 
| Austin | 
SH 71 East Corridor | 
Construct two new overpass bridges on SH 71 at Ross and Kellam Roads | 
| Austin and Dripping Springs | 
US 290 West Projects and Studies | 
TxDOT is constructing and developing several projects and studies along and near US 290 west of Austin | 
| Bastrop County | 
SH 21 from County Road to Old Highway 20 | 
Developing preliminary plans to expand SH 21 from a four-lane undivided to a four-lane divided roadway | 
| Bastrop County and East Travis County | 
FM 969 Corridor Study | 
CAMPO and TxDOT are working together to identify, evaluate, and recommend potential improvements for FM 969 from SH 130 in East Travis County to SH 21 in Bastrop County | 
| Blanco County | 
US 281 from US 290 to the Comal County Line | 
Developing preliminary plans to improve US 281 to a four-lane divided highway | 
| Blanco County | 
US 281 Blanco Relief Route Feasibility Study | 
This study will explore and evaluate a relief route around the city of Blanco to alleviate congestion within the city and its downtown square district | 
| Cedar Park | 
Parmer Lane (FM 734) Corridor Study | 
 Improvements for Parmer Lane (FM 734) from MoPac (Loop 1) in North Austin to Whitestone Boulevard (RM 1431) | 
| Georgetown | 
I-35 Georgetown to Round Rock Project | 
Proposes to add two non-tolled high-occupancy vehicle (HOV) managed lanes in each direction from SH 29/University Avenue to SH 45 North | 
| Giddings | 
US 290 Giddings Mobility Study | 
A mobility study to identify future improvements | 
| Hays County | 
RM 1826 Feasibility Study | 
A feasibility study to identify future safety and mobility improvements along RM 1826 from the Travis County Line to RM 150 | 
| Hays and Caldwell counties | 
SH 21 from SH 80 to SH 130 | 
Studying the corridor to identify potential solutions to transportation needs along the corridor | 
| Lee County | 
US 77 from FM 2440 to SH 21 | 
Developing preliminary plans to expand US 77 from a four-lane undivided to a four-lane divided roadway | 
| Marble Falls | 
US 281 at SH 71 Interchange | 
Proposed project would construct a new interchange at US 281 at SH 71 | 
| Round Rock | 
US 79 | 
Proposed improvements to the US 79 from I-35 to east of FM 1460 (A.W. Grimes) | 
| Travis and Bastrop counties | 
FM 812 from US 183 to SH 21 | 
Developing preliminary plans to improve FM 812 to a four-lane divided roadway | 
| Travis and Hays counties | 
RM 1826 from US 290 to RM 150 | 
Constructing short-term improvements and conducting long-range planning to improve safety and mobility | 
| Travis County | 
FM 973 Realignment | 
Proposing to realign FM 973 in a new location between US 290 and SH 130 in east-central Travis County | 
| Travis County | 
US 183 from SH 71 to SH 130  | 
A study to explore potential improvements to US 183 from SH 71 to SH 130 | 
| Travis County | 
RM 1826 from US 290 to SH 45 | 
Widening RM 1826 from US 290 to SH 45 with construction extending to the Hays County line | 
| Williamson County | 
US 183 Frontage Roads | 
Proposed improvements include adding frontage roads and a shared-use path along 183A from RM 1431 to Avery Ranch Road | 
| Williamson County | 
FM 973 Corridor Project | 
Study will identify, evaluate, and recommend potential improvements for FM 973 from Samsung Highway to US 79 near Taylor, TX | 
| Williamson and Burnet counties | 
US 183 from SH 29 to FM 963 Study | 
Study will evaluate a four-lane urban freeway with frontage roads and interchanges in Williamson County and a four-lane rural divided highway in Burnet County |