Yoakum
Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Description |
Colorado County | I-10 from FM 2434 to US 90 | Proposed improvements include reconstruct and widen the existing I-10 roadway from FM 2434 to US 90 (Alleyton Road South) |
El Campo | US 59 Improvement Project | Improve US 59 to interstate standards |
Wharton County | US 59 Improvement Project | Improve US 59 to interstate standards |
Victoria | US 77 | Improve US 77 between US 87 and FM 1685 from two lanes to four lanes |
Location | Project | Description |
Bloomington | SH 185 | Proposed improvements to SH 185 crossing |
Location | Project | Description |
DeWitt County | SH 72 | This project includes widening of SH 72 from Karnes County Line to 0.25 mile east of FM 2980 |
DeWitt County | SH 72 | This project includes widening of SH 72 from FM 237 to US 87 |
Austin and Waller Counties | I-10 from FM 359 to FM 3538 | The construction project runs along 16 miles of I-10 from FM 359 in Waller County to FM 3538 in Austin and Waller counties |
Austin and Colorado Counties | I-10 from FM 2761 to FM 3538 | This project consist of widening and reconstruction of I- 10 from FM 2761 in Colorado County to FM 3538 in Austin County, Texas |
Colorado County | I-10 from US 90 to FM 2761 | This project include reconstruct and widen the existing I-10 roadway from US 90 (Alleyton Road South) to FM 2671 |
Colorado County | I-10 from CR 250 to FM 2434 | The proposed project would reconstruct and widen the existing I-10 roadway |
Victoria | BU 59T Median Project | Proposed improvements to BU 59T locally known as Rio Grande Street and Houston Highway from Navarro Street to Loop 463 |
Victoria | Navarro Street (BU 77) Median Project | Proposed improvements to Navarro Street (BU 77) from Loop 463 to Airline Road |
Sargent | FM 457 Bridge Replacement | The FM 457 swing bridge is in need of replacement because of its age and the high maintenance costs associated with its upkeep |