The proposed project would construct a two-lane overpass on SH 185 crossing the railroad within the town of Bloomington. Access roads would be constructed on each side of the overpass to provide access to existing city streets and commercial/residential properties.

The proposed project also includes the realignment of FM 616 from the intersection with King Road east of Bloomington, shifting to the south side of and parallel to King Road, intersecting with SH 185 just south of the existing SH 185/King Road intersection. King Road would terminate in cul-de-sacs on the east side of SH 185 as well as the east end of King Road approximately 0.5 miles east of SH 185. Herbert Avenue would be extended approximately 100 ft to provide access to the realigned FM 616.