| Location | Project | Description |
| Austin | Loop 360 - Capital of Texas Highway | Proposed upgrades on nine intersections to collectively provide substantial benefits for congestion relief |
| Austin | MoPac South | Proposed improvements from Cesar Chavez Street to Slaughter Lane |
| Austin | Oak Hill Parkway | Long-term mobility improvements to US 290 and SH 71 through Oak Hill |
| Austin | RM 620 Projects | Improvements to RM 620 to SH 71 in Bee Cave to I-35 in Round Rock |
| Austin | SH 71 East Corridor | Construct two new overpass bridges on SH 71 at Ross and Kellam Roads |
| Austin and Dripping Springs | US 290 West Projects and Studies | TxDOT is constructing and developing several projects and studies along and near US 290 west of Austin |
| Bastrop County | SH 21 from County Road to Old Highway 20 | Developing preliminary plans to expand SH 21 from a four-lane undivided to a four-lane divided roadway |
| Bastrop County and East Travis County | FM 969 Corridor Study | CAMPO and TxDOT are working together to identify, evaluate, and recommend potential improvements for FM 969 from SH 130 in East Travis County to SH 21 in Bastrop County |
| Blanco County | US 281 from US 290 to the Comal County Line | Developing preliminary plans to improve US 281 to a four-lane divided highway |
| Blanco County | US 281 Blanco Relief Route Feasibility Study | This study will explore and evaluate a relief route around the city of Blanco to alleviate congestion within the city and its downtown square district |
| Cedar Park | Parmer Lane (FM 734) Corridor Study | Improvements for Parmer Lane (FM 734) from MoPac (Loop 1) in North Austin to Whitestone Boulevard (RM 1431) |
| Giddings | US 290 Giddings Mobility Study | A mobility study to identify future improvements |
| Hays County | RM 1826 Feasibility Study | A feasibility study to identify future safety and mobility improvements along RM 1826 from the Travis County Line to RM 150 |
| Hays and Caldwell counties | SH 21 from SH 80 to SH 130 | Studying the corridor to identify potential solutions to transportation needs along the corridor |
| Lee County | US 77 from FM 2440 to SH 21 | Developing preliminary plans to expand US 77 from a four-lane undivided to a four-lane divided roadway |
| Marble Falls | US 281 at SH 71 Interchange | Proposed project would construct a new interchange at US 281 at SH 71 |
| Round Rock | US 79 | Proposed improvements to the US 79 from I-35 to east of FM 1460 (A.W. Grimes) |
| Travis and Bastrop counties | FM 812 from US 183 to SH 21 | Developing preliminary plans to improve FM 812 to a four-lane divided roadway |
| Travis and Hays counties | RM 1826 from US 290 to RM 150 | Constructing short-term improvements and conducting long-range planning to improve safety and mobility |
| Travis County | US 183 from SH 71 to SH 130 | A study to explore potential improvements to US 183 from SH 71 to SH 130 |
| Travis County | RM 1826 from US 290 to SH 45 | Widening RM 1826 from US 290 to SH 45 with construction extending to the Hays County line |
| Travis and Williamson Counties | FM 973 Corridor Projects | TxDOT and the Capital Area Metropolitan Planning Organization (CAMPO) are planning for improvements to enhance mobility and reduce congestion along the FM 973 corridor. |
| Travis and Williamson counties | SH 130 / SH 45N Improvement Project | TxDOT is planning to improve 16 miles of SH 130 from I-35 to RM 685 and 4 miles of SH 45 N from A.W. Grimes to SH 130 in Travis and Williamson counties. |
| Williamson County | US 183 Frontage Roads | Proposed improvements include adding frontage roads and a shared-use path along 183A from RM 1431 to Avery Ranch Road |
| Williamson and Burnet counties | US 183 from SH 29 to FM 963 Study | Study will evaluate a four-lane urban freeway with frontage roads and interchanges in Williamson County and a four-lane rural divided highway in Burnet County |