SH 130 improvements
Skip to main content
Careers Contact us

SH 130 improvements

State Highway 130 is a tolled roadway that runs from SH 45 SE in Travis County to I-35 in Williamson County. TxDOT currently has two improvement projects planned in North Travis and Williamson counties: the SH 130/SH 45 N Improvement Project and the SH 130 at Gattis School Road Improvement Project. More information about each project can be found below or in the following fact sheet.

A map showing the Round Rock area at the Williamson and Travis counties line depicts SH 130 improvement projects. A widening project is shown on SH 130 from I-35 to SH 45 Southeast and on SH 45 Southeast from A.W. Grimes Boulevard to SH 130. A project to create a diverging-diamond interchange is also shown at the intersection of Gattis School Road and SH 130.

SH 130/SH 45 N Improvement Project

Overview

TxDOT is planning to improve 16 miles of SH 130 from I-35 to RM 685 and four miles of SH 45 N from A.W. Grimes to SH 130 in Travis and Williamson counties. The project will:

  • Add a lane to northbound and southbound SH 130 in the median
  • Construct a third lane for eastbound SH 45 N

No new right of way is required for the project.

Project information

Below is the comment response matrix used to record and communicate comments and responses generated as a result of the environmental review. For a copy of the complete notice and opportunity to comment summary report, please contact the TxDOT Austin District at 512-832-7000.

Questions or comments

All input will be considered as TxDOT works to improve safety and mobility on SH 130 and SH 45 N.

Timeline

  • Environmental development: early 2025
  • Community update: early 2026
  • Design finalized: September 2026
  • Project out to bid: January 2027
  • Construction start: spring 2027
  • Anticipated construction end: late 2031
The estimates timeline for the SH 130/SH 45 N Improvement Project is shownn as: environmental development in early 2025, community update in early 2026, design finalized in September 2026, project out to bid in January 2027, construction start in spring 2027, anticipated construction end in late 2031.

SH 130 at Gattis School Road Improvement Project

Overview

TxDOT, in coordination with Williamson County and local partners, is proposing improvements at the SH 130 at Gattis School Road intersection to improve safety and mobility in a rapidly growing area of Williamson County. The proposed improvements will:

  • Convert the Gattis School Road intersection into a diverging diamond interchange (DDI).
  • Add new entrance/exit ramps and bypass lanes.
  • Enhance pedestrian accommodations.

No new right of way is required for the project.

Project information

Questions or comments

All input will be considered as TxDOT works to improve safety and mobility on SH 130 at Gattis School Road.

Timeline

  • Community update: September 2026
  • Design finalized: late 2026
  • Environmental development: early 2027
  • Construction start: late 2027
  • Anticipated construction end: late 2029