Tyler
Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Description |
Gregg & Smith Counties | I-20 6-Lane Expansion Project | I-20 6-Lane Expansion Project through Gregg and Smith counties |
Smith County | I-20 Lindale | Widening of I-20 from Harvey Rd. (CR 433) east to US 69 |
Gladewater | US 271 | Expansion of US 271 from FM 16 north to the Upshur County line |
Jacksonville | US 69 Jacksonville Relief Route | Preliminary study of a potential relief route around Jacksonville |
Tyler | US 69 South Broadway | Preliminary plans to improve US 69 - South Broadway from South Town Drive to FM 2813 in Smith County |
Tyler | SH 31 | Expansion of SH 31 from Loop 323 in Tyler, east to FM 1639 in Kilgore |
Longview | SH 31 (Spur 63) | Widening and reconstruction of SH 31 (Spur 63) from South Street to US 80 |
Tyler | FM 2493 - Loop 323 to FM 2813 | Preliminary plans for FM 2493 from Loop 323 south to FM 2813. |
Tyler | FM 2964 from SH 110 south to FM 346 | Preliminary plans for the expansion of FM 2964 (Rhones Quarter Road) from SH 110 in the City of Tyler south to FM 346 in the City of Whitehouse |
Rusk County | SH 315 from US 259 to Panola County line | Evaluation of alternatives to widen SH 315 in Rusk County, Texas from US 259 to the Panola County line |
Bullard | FM 756 | Preliminary plans for the expansion of FM 756 from Jeff Davis Drive south to FM 344 |
East Texas | I-20 East Texas Corridor Study | Evaluation of current safety and capacity needs from Dallas to the Louisiana border |