FM 2964 from SH 110 South to FM 346
Skip to main content

FM 2964 from SH 110 South to FM 346

Overview

TxDOT developed preliminary plans for the expansion of FM 2964 (Rhones Quarter Road) from SH 110 in Tyler south to FM 346 in Whitehouse. The scope of work includes widening the existing two-lane roadway to a four-lane divided highway with a continuous left-turn lane.

Details

Enhancements include:

  • Widening from a two-lane roadway to a four-lane roadway with flush medians
  • Redesigning the roadway's alignments to meet current design standards
  • Addressing the FM 2964/SH 110/Shiloh Road intersection in Tyler
  • Realigning FM 2964 with CR 2277 at FM 346 in Whitehouse
  • Adding shared-use paths to improve bicycle and pedestrian safety

The project will require the acquisition of new right of way from adjacent property owners.

The public may ask questions at any time during the project development process.

Public outreach included the following:

  • TxDOT presented three design alternatives for public comment on March 7, 2019, at the first public meeting
  • TxDOT presented the preferred alternative for public comment on Sept. 17, 2019. A copy of this alternative is available for viewing through the Interactive Map link below
  • TxDOT held a virtual public hearing along with a in-person public hearing on Aug. 25, 2022.
  • TxDOT issued a notice of availability of finding of no significant impact (FONSI) on March 1, 2023.

Downloads

Schedule

Next steps include:

  • Right-of-Way Acquisitions - beginning 2023
  • Construction expected to begin in 2028, based on current financial forecasts