Before a project is built, a study must be done to determine if it will fill a transportation need, will it not negatively impact the surrounding area and does it fit the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction. For information on upcoming public meetings visit the TxDOT hearings, meetings and notices schedule page on txdot.gov.

Paris District Projects

LocationProjectDescription
Grayson CountyFM Spur 121 (Grayson Parkway)Constructed new location roadway from CR 60 to FM 121. Completed August 2023.
Grayson CountyUS 75 Improvements in ShermanA project to develop long-term transportation and operational improvements on US 75 and US 82 in Sherman, Texas.
GunterFM 121 Gunter Relief RouteProposed infrastructure options to reduce traffic congestion on the existing roadways and the Town of Gunter.
GunterFM 121W ProjectProposed project would widen the existing two-lane undivided roadway into a four-lane divided roadway with a center two-way left-turn lane from SH 289 to FM 3356
Hunt CountyI-30 Hunt County West from FM 2642 to SH 34Reconstruction and widening of the four-lane freeway to six lanes, reconfiguration of access ramps, and incorporation of one-way frontage roads from FM 2642 to SH 34
Lamar and Red River CountiesUS 271 from Loop 286 to SH 37Proposed project would widen the existing two-lane undivided roadway into a four-lane divided roadway from SL 286 in Paris to SH 37 in Bogata. 
Red River CountyUS 271 from SH 37 to Trent Lake BridgeProposed project would widen the existing two-lane undivided roadway into a four-lane divided roadway from SH 37 in Bogata to north of Trent Lake Bridge.
Lamar CountyUS 82 from Fannin County Line to Loop 286Proposed project would widen the existing two-lane undivided roadway into a four-lane divided roadway from the Fannin County Line to Loop 286.
ParisLoop 286 ImprovementsEvaluation of potential short- and long-term roadway and operational improvements for Loop 286 in Paris.
Lamar and Red River County US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop ProjectsProposed improvements on US 82 from the BU 82/SH 37 junction to FM 412 in the City of Clarksville, Red River County, Texas.