Paris
Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Description |
Grayson County | FM Spur 121 | Proposed new construction roadway from CR 60 to north of FM 121. |
Grayson County | Grayson County Tollway Study | Examines the potential extension of the Dallas North Tollway to US 75. |
Grayson County | US 75 | A project to develop long-term transportation and operational improvements on US 75 and US 82 in the Cities of Sherman and Denison in Grayson County, Texas. |
Grayson County | US 82 Safety Improvement Feasibility Study | A feasibility study to improve US 82 corridor safety and mobility. |
Gunter | FM 121 Gunter Relief Route | Proposed infrastructure options to reduce traffic congestion on the existing roadways and the Town of Gunter. |
Gunter | FM 121W Project | Proposed project would widen the existing two-lane undivided roadway into a four-lane divided roadway with a center two-way left-turn lane from SH 289 to FM 3356 |
Hunt County | I-30/FM 2642 Bridge Replacement | A $23.2 million bridge replacement project on I-30 in Hunt County at FM 2642 that extends 3.9-miles from the Rockwall County line to FM 1565. |
Hunt County | I-30 Hunt County West from FM 2642 to SH 34 | Reconstruction and widening of the four-lane freeway to six lanes, reconfiguration of access ramps, and incorporation of one-way frontage roads from FM 2642 to SH 34 |
Hunt County | SH 34 Feasibility Study | A feasibility study along an approximately 20-mile segment of SH 34 from I-30 to CR 2312. |
Lamar and Red River Counties | US 271 from Loop 286 to SH 37 | Improvements on US 271 from Loop 286 in Paris to SH 37 in Bogata. |
Lamar and Red River Counties | US 271 from SH 37 to Trent Lake Bridge | Improvements on US 271 from SH 37 to north of Trent Lake Bridge |
Lamar County | US 82 Lamar County | Proposed improvements include widening of US 82 from a two-lane highway to a four-lane divided highway. |
Paris | Loop 286 Improvements | Evaluation of potential short- and long-term roadway and operational improvements for Loop 286 in Paris. |
Paris | US 82 (Lamar Ave.) from 33rd St. to 42nd St. | Construction of a raised center median and turn lanes on US 82 (Lamar Avenue). |