FM 121 West
Project details
The FM 121W project would widen the existing two-lane undivided roadway into a four-lane divided roadway with a center two-way left-turn lane from SH 289 to FM 3356; a distance of 7.2 miles.
For the FM 121W project, subject to final design considerations, would require additional right of way and would potentially displace two residences and nine non-residential structures. The proposed projects would involve actions in floodplains and may involve actions in wetlands.
Public involvement
- Public meeting - Jan. 31, 2019
- Virtual public meeting with in-person option – June 21, 2022