Fort Worth
Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
| Location | Project | Description | 
| Arlington | I-20 from Park Springs Boulevard to SH 161 | The proposed project would reconstruct I-20 and add one mainlane each direction from Park Springs Boulevard to SH 161 in Arlington | 
| Arlington | SH 360 | The expansion of SH 360 in Tarrant County | 
| Burleson | FM 3391 | The proposed project would widen and reconstruct FM 3391 from I-35W to east of County Road 602 | 
| Cresson | US 377 at SH 171 | Improvements to US 377 at SH 171 | 
| Dallas and Tarrant County | I-20 Arlington Grand Prairie Corridor Study | TxDOT is conducting a corridor study of I-20 from US 287 in Tarrant County to east of South Carrier Parkway in Dallas County. In the Dallas/Fort Worth area | 
| Erath County | Dublin BUS 67 | Roadway resurfacing located in Dublin in Erath County | 
| Fort Worth | DFW Connector | The reconstruction and expansion of SH 114 and SH 121 | 
| Fort Worth | I-30 Corridor | Improvements to the I-30 corridor throughout the Fort Worth region | 
| Fort Worth | I-35W Corridor | Improvements to the I-35W corridor throughout the Fort Worth region | 
| Fort Worth | I-820 East Loop | Improvements to I-820 from the north interchange at SH 121 to Randol Mill Road and SH 121 from Handley-Ederville Road to the I-820/SH 121 interchange | 
| Fort Worth | SH 180 (East Landcaster Avenue) from I-35W to I-820 | The proposed project would improve vehicle, bicycle, and pedestrian mobility and safety along the corridor | 
| Fort Worth | Southeast Connector | Proposed improvements for the interchange at I-820, I-20 and US 287 | 
| Fort Worth District | Fort Worth District Transportation Master Plan | The TxDOT Fort Worth District is developing a Transportation Master Plan for all TxDOT on-system roadways (approximately 9,200 lane miles) in the district | 
| Hood County | US 377 | Potential improvements on US 377 in Granbury from FM 51 to FM 167 South | 
| Jacksboro | US 281 at US 380 | Proposing safety improvements for the intersection of US 281 at US 380 south of Jacksboro in Jack County | 
| Johnson County | FM 157 | The proposed realignment of FM 157 from Business 287 to FM 1807 | 
| Johnson County | I-35W Segment 2 from FM 3391/East Renfro Street to East CR 405 | TxDOT proposes to reconstruct and widen the I-35W corridor main lanes to three 12-foot-wide general purpose lanes and auxiliary lanes in each direction. | 
| Johnson and Somervell Counties | US 67 | Improvements to the US 67 corridor throughout the Fort Worth region | 
| Mansfield | FM 917 from I-35W to south of BU 287P | Improvements to FM 917 from I-35W to south of BU 287P in Johnson County, Texas | 
| North Tarrant County | FM 156 | Improvements to FM 156 from US 287 to McLeroy Boulevard/Watauga Road | 
| North Tarrant County | SH 183 from I-30 to SH 199 | Proposed improvements to increase capacity, enhance safety and mobility and ease congestion on SH 183 from I-30 to SH 199 | 
| Parker and Tarrant Counties | I-20 to Markum Ranch Road and I-30 to Linkcrest Drive | The proposed project would include three new interchanges on I-20 and one new interchange on I-30 | 
| Tarrant County | I-820 Northwest Loop Corridor | Study of proposed improvements on the I-820 Northwest Loop Corridor from I-30 to I-35W. | 
| Tarrant County | FM 1187 | Improvements to the FM 1187 corridor throughout the Fort Worth region | 
| Tarrant County | I-20 Benbrook | Improvements to I-20 in Benbrook including adding one auxiliary lane in each direction | 
| Tarrant County | I-30 West Project from I-820 to Camp Bowie Boulevard | Proposed improvements that would increase capacity, improve safety and mobility and ease congestion in this area | 
| Tarrant County | North Tarrant Express | Overall mobility plan to expand I-35W, I-820 and SH 121/183 in north Tarrant County | 
| Tarrant County | SH 199 | Development of a 17-mile section of the State Highway 199 corridor in Tarrant County from Western Center Boulevard to White Settlement Road | 
| Tarrant County | RM 2871 | The proposed project would reconstruct and widen RM 2871 from US 377 to I-30 | 
| Tarrant and Wise County | FM 730 from SH 114 to SH 199 | The proposed project would identify, study and design mobility and safety-related improvements on FM 730 from SH 114 to SH 199 in Tarrant and Wise counties | 
| Tarrant and Wise County | US 81/US 287 Corridor | Proposed projects along the US 81/US 287 corridor |