Alternative delivery projects
Skip to main content

Alternative delivery projects

Overview

The Texas Legislature authorized the Texas Department of Transportation (TxDOT) to use alternative delivery contracting methods under Title 6, Subtitle B, Chapter 223, Subchapters E and F of the Texas Transportation Code. These contracts, primarily known as design-build (DB) and comprehensive development agreements (CDAs), are awarded using a best-value approach that evaluates price, proposer qualifications, and overall project approach.

Alternative delivery contracts allocate varying levels of risk and responsibility to the DB Contractor through the following procurement options:

  • DB with a General Warranty
  • DB with a Performance Warranty
  • DB with a Capital Maintenance Contract (CMC)
  • DB with a Comprehensive Maintenance Agreement (COMA)
  • CDA

The Alternative Delivery Division (ALD) oversees and manages the Alternative Delivery Program (ADP).

Contract types

DB contracts

DB contracts allow design, construction, utility relocation, and maintenance to occur simultaneously under a single contract. The contract does not include financial participation from the private sector, a long term-lease, or operation of the facility.

CDAs

CDAs allow design, construction, utility relocation, and maintenance activities to occur simultaneously under a single contract. They may also include financial participation from the private sector and for long term lease or operation of the facility. CDAs can be a concession or a DB. TxDOT has five such projects in operation or under construction. It is important to note that broad authority to enter into new CDAs expired in 2017.

Program resources

Published ADP resources, including trainings and statutory citations.

Projects

Future projects

TxDOT continually analyzes potential projects to determine which would be most suitable as an alternative delivery contract. A quarterly report illustrates TxDOT’s planned procurements for the next five to ten years.

ALD provides support activities for the program and performs procurement of alternative delivery projects. Prior to beginning a procurement project, ALD collaborates with districts to advance project development activities and information to enhance the procurement process.

Pre-procurement projects

Prior to beginning a procurement project, ALD collaborates with districts to advance project development activities to enhance the procurement process.

Procurement projects

Procurement projects are approved by the Texas Transportation Commission to issue a request for qualifications (RFQ).

North Houston Highway Improvement Project (NHHIP) 3C-2

Executed projects

(includes CDAs and DBs)
Execution dateProjectDeveloper/DB ContractorDistrict TypeCCSJProject ID
07/15/2026SH 99 Grand Parkway Segment B-1 DBFerrovial Construction-Webber 99 JVHoustonDesign-build3510-01-001A00116693
08/16/2023I-35 Northeast Expansion SouthLone Star Constructors, NEXSan AntonioDesign-build0017-10-168A00006479
02/24/2022Southeast ConnectorSouth-Point ConstructorsFort WorthDesign-build0008-13-125A00007509
09/17/2021I-35E Phase 2Lone Star ConstructorsDallasDesign-build0196-03-274A00062253
07/22/2021I-35 Northeast Expansion CentralAlamo NEX Construction, LLCSan AntonioDesign-build0016-06-047A00006206
08/10/2020Oak Hill ParkwayColorado River ConstructorsAustinDesign-build0113-08-060A00016455
08/22/2019I-2/I-69C InterchangesDragados-Pulice J.V.PharrDesign-build0039-17-175A00070178
08/22/2019I-635 LBJ EastPegasus Link ConstructorsDallasDesign-build2374-01-137A00054742
10/03/2017SH 249 ExtensionWilliams Brothers Construction Co.Bryan, HoustonDesign-build3635-02-002A00119923
06/30/2017SH 99 Grand Parkway Seg H, I-1 and I-2Grand Parkway Infrastructure, LLCBeaumont, HoustonDesign-build3510-07-003A00117302
06/30/2017Southern GatewayPegasus Link ConstructorsDallasDesign-build0442-02-088A00028576
03/04/2016SH 288 Managed Lanes (Harris Co.)Blueridge Transportation GroupHoustonCDA concession (terminated)0598-01-090A00094000
09/28/2015US 181 Harbor Bridge ReplacementFlatiron-Dragados USA, J.V.Corpus ChristiCDA design-build0101-06-095A00077018
05/15/2015SH 360 ProjectLane - Abrams Joint VentureFort WorthDesign-build2266-02-136A00054523
11/20/2014Midtown Express SH 183 MLSouthGate Mobility Partners, LLCDallas, Fort WorthCDA design-build0094-03-065A00013164
08/29/2014SH 71 Express LanesMcCarthy Building Companies, Inc.AustinDesign-build0265-01-110A00021553
08/22/2014Loop 375 Border Highway West ExtAbrams – Kiewit Joint VentureEl PasoCDA design-build2552-04-027A00053539
02/10/2014Energy Sector Roadway RepairESR2P Builders, LLCCorpus Christi, Laredo, San Antonio, YoakumDesign-build0237-01-018A00081136
12/05/2013Loop 1604 Western ExtWilliams Brothers Construction Company, Inc.San AntonioDesign-build2452-01-036A00054243
07/30/2013US 77 Upgrade Kingsville to DriscollAustin-Bay, J.V.Corpus ChristiDesign-build0102-03-081A00076122
05/17/2013I-35E Managed LanesAGL ConstructorsDallasCDA design-build0196-02-068A00019205
03/22/2013SH 99 Grand Parkway Seg F-1, F-2, GZachry-OdebrechtHoustonCDA design-build0912-00-471A00099484
03/01/2013North Tarrant Express / I-35WNTE Mobility Partners Segments 3, LLCFort WorthCDA concession0014-16-179A00007311
02/20/2013Dallas HorseshoePegasus Link ConstructorsDallasDesign-build1068-04-116A00044972
10/06/2009DFW ConnectorNorthGate Constructors, J.V.Dallas. Fort WorthCDA design-build0353-03-059A00023749
09/04/2009LBJ-635 Express CorridorLBJ Infrastructure GroupDallasCDA concession2374-01-068A00054474
06/23/2009North Tarrant ExpressNTE Mobility PartnersFort WorthCDA concession0008-14-058A00007962
03/22/2007SH 130 Seg. 5 & 6SH 130 Concession Company, LLCAustin, San AntonioCDA concession3583-02-003A00055843
06/19/2002SH 130 Seg. 1 -4Lone Star Infrastructure, JVAustin, San AntonioExclusive development  