Southeast Connector
Skip to main content

Southeast Connector

Alternative Delivery projects

TxDOT has evaluated the design, construction, and maintenance of a project to reconstruct and widen I-20 from Forest Hill Drive to Park Springs Boulevard, I-820 from I-20 to Brentwood Stair Road, and US 287 from Bishop Street to Sublett Road in Tarrant County, including interchanges (Southeast Connector Project).

Visit the project page for more information on the Southeast Connector Project.

Southeast Connector map

CCSJ: 0008-13-125
Project ID: A00007509