Southeast Connector
Alternative Delivery projects
TxDOT evaluated the design, construction, and maintenance of a project to reconstruct and widen I-20 from Forest Hill Drive to Park Springs Boulevard, I-820 from I-20 to Brentwood Stair Road, and US 287 from Bishop Street to Sublett Road in Tarrant County, including interchanges (Southeast Connector Project).
Visit the project page for more information on the Southeast Connector Project.