Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits TxDOT's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Phase | Description |
---|---|---|---|
Chambers County | FM 565 | Study | Reconstruct and widen FM 565 from SH 99 to SH 146 |
Chambers County | FM 565 “S-Curve” Project | Study | Realign and reconstruct FM 565 from FM 2354 to FM 1405 |
Chambers County | I-10 at FM 3180 Interchange | Study | Improve the I-10 at FM 3180 interchange |
Chambers and Liberty Counties | FM 1409 Extension | Construction | Provide a continuous link between Old River-Winfree, I-10 and FM 565 |
Hardin County | US 96 Safety Enhancement Project | Construction | Improve US 96 beginning 0.2 miles north of West Chance Road and ending at Lindsey Drive in Lumberton |
Jasper | US 190 Bridge | Construction | Replace bridge on US 190 at east bank of the Steinhagen Reservoir |
Jasper and Sabine Counties | US 96 | Study | Improve US 96 from Recreational Road (RE) 255 to Loop 149 in Jasper and Sabine Counties |
Jefferson County | FM 3180 and FM 2354 Corridor | Construction | Improve the FM 3180 and FM 2354 corridor to reduce congestion, increase mobility and improve safety |
Jefferson County | I-10 Interchanges Project | Study | Reconstruct and expand I-10 and US 69 where they converge in Beaumont |
Jefferson County | US 69/SH 73 Interchange | Study | Improve US 69 and SH 73 interchange southeast of Beaumont near Port Arthur |
Liberty County | US 90 | Project | Reconstruct and widen US 90 from FM 563 to SH 61 |
Newton County | SH 63 Historic Bridge | Study | Improve the SH 63/LA 8 bridge at the Sabine River that crosses the Texas and Louisiana state line |
Orange County | I-10 from FM 3247 to Sabine River Bridge | Study | Widen I-10 from East of 3247 to the Sabine River Bridge |
Tyler and Hardin Counties | US 69 Corridor | Study | Improve the US 69 corridor study area that covers different segments stretching across Tyler and Hardin Counties, from FM 1003 to Black Creek |
Copyright 2020
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701