US 82 from 0.9 mile west of FM 989 to I-369 west frontage road
US 82 Corridor - Bowie County
CSJ: 0046-06-040
Project description
The US 82 proposed widening and reconstruction project will upgrade from a 2-lane roadway to a 4-lane roadway with a center left-turn lane, bike lanes, and sidewalks. This project would include a drainage design featuring a new storm drain system with inlets. Additional right of way would be required.
Funding and letting information
The US 82 at FM 989 is estimated to cost $48.4 million and is currently NOT FUNDED. The project has a projected let date of January 2033.
Public involvement
The purpose of public involvement is to share project information and updates, present proposed schematics of the project and collect input from the community. TxDOT is committed to working closely with the community on this project. There was a virtual public meeting on July 21, 2020. This virtual public meeting was to provide information and receive comments from the public for the proposed widening and reconstruction projects on US 82 from 0.9 mile west of FM 989 to I-369 west frontage road. To access the public involvement website and documents from this meeting please click here.