US 82 Corridor - Bowie County
TheAtlanta District is preparing plans to widen the existing 2-lane highway to 4-lane divided highway to improve mobility and safety on this Texas Trunk System, National Highway System, and Texas Freight Corridor. The purpose of these projects is to improve safety, mobility, regional connectivity, and address roadway deficiencies. The proposed improvements are needed to accommodate future traffic volumes and establish consistency along the US 82 corridor.
These corridor improvements have been divided into the following projects for funding considerations:
US 82 from 0.1 mile west of CR 3403 (Red River County line) to 0.1 mile west of US 259
CSJ: 0046-03-040
Learn more about this US 82 project.
US 82 from 0.1 mile west of US 259 to 0.4 mile south of I-30
CSJ: 0046-03-038 CSJ: 0046-03-044 CSJ: 0046-04-062
CSJ: 0046-04-061 CSJ: 0046-04-063
Learn more about this US 82 project.
US 82 from 0.9 mile west of FM 989 to I-369 west frontage road
CSJ: 0046-06-040
Learn more about this US 82 project.