Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Phase | Description |
---|---|---|---|
Brown County | US 377 Main Street | Preliminary Design | Improve US 377 (Main Street) in Brownwood to enhance traffic flow and safety |
Comanche County | SH 6 | Preliminary Design | Upgrade and widen SH 6 from SH 16 N. to East De Leon city limits |
Comanche County | SH 36 | Preliminary Design | Improve SH 36 from US 67 to CR 324 |
Eastland County | SH 6 | Preliminary Design | Improve SH 6 in Gorman, from 0.18 mile north of Crescent Street to the Comanche County Line |
Eastland County | I-20 | Construction | Realign and reconstruct roadway at Ranger Hill |
Lampasas County | US 281 | Preliminary Design | Reconfigure the US 190 (Plum Street) intersection and reconstruct US 281 between Sulphur Creek and the Burnet County Line |
Lampasas County | US 190 Intersections Improvement Project | Preliminary Design | Improve two US 190 intersections, which includes FM 2808 at US 190 and FM 2313 at US 190 |
McCulloch County | US 87 | Preliminary Design | Reconstruct US 87 from Church Street to CR 307 (Jacquelyn Ruffin Road) |
San Saba County | FM 45 | Study | Reconstruct and widen the existing two-lane undivided roadway |
Stephens County | FM 3099 | Preliminary Design | Improve the FM 3099 roadway from Northglen Road to south of US 180 in Breckenridge, along with the intersection at US 180 |
Copyright 2021
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701