On February 26, 2009, the selection of best-value proposal was conditionally awarded to LBJ Development Partners, in Minute Order 111703, to develop, design, construct, finance, and maintain and operate the I-635 Managed Lanes Project along I-635 from east of Luna Road to Greenville Avenue and on I-35E from south of the Loop 12/I-35E split to south of Valwood Parkway in Dallas County.
On May 7, 2009, TxDOT held a public hearing to review financial information for the project.
Executed documents
On September 4, 2009, TxDOT executed a comprehensive development agreement (CDA) with the LBJ Infrastructure Group (formerly LBJ Development Partners). The executed documents are available below. In addition, contract amendments executed are also available below.
Executed 09/04/2009 | |
Book 2A - Technical Provisions | Technical Provisions |
Book 2A Attachments 01-1A to 26-1A | Attachment 01-1A - Project Limits |
Attachment 01-2A - O&M Work Limits | |
Attachment 02-1A - Base Work Breakdown Structure (WBS) | |
Attachment 02-2A - Schedule of Values Example | |
Attachment 02-3A - Document Data Properties | |
Attachment 02-4A - Toll Operations Document Retention Schedule | |
Attachment 05-1A - Utility Bridge Locations for Drainage | |
Attachment 07-1A - ROW Parcels | |
Attachment 07-2A - Property Descriptions and Locations | |
Attachment 11-1A - Interstate Access Justification Report | |
Attachment 12-1A - Drainage Criteria Manual | |
Attachment 12-2A - Amendment Drainage Criteria Manual | |
Attachment 14-1A - Amendment Traffic Operations Manual | |
Attachment 19-1AA - Performance and Measure Table Baseline | |
Attachment 19-2A - Amendment to Texas Reference Marker Users Manual and manuals, etc | |
Attachment 26-1A - Amendments to NFPA 502 |
Executed 09/04/2009 | |
Book 2B | Programmatic Technical Provisions |
Book 2B - Attachment 1 | Project Management Plan Contents |
Book 2B - Attachment 7 | Utility Forms |
Book 2B - Attachment 8 | Utility Assembly and Tracking Report Requirements |
Executed 09/04/2009 | |
Book 3 | Technical Documents |