DFW Connector - request for qualifications (rfq)
DFW Connector
Authorizations and approvals
On March 30, 2006, the Texas Transportation Commission (TTC), in Minute Order 110469, authorized TxDOT to issue a request for qualifications (RFQ) to develop, design, construct, and potentially finance, maintain, and operate the DFW Connector Project.
TxDOT received and evaluated qualifications submitted on May 1, 2007. In June, the Texas Transportation Commission (TTC) authorized a short list of teams to submit more detailed proposals.
RFQ documents
On January 30, 2007, interested parties attended a Pre-Proposal Workshop for SH 114 (DFW Connector).
TxDOT issued the original request for qualifications on December 29, 2006. Two addenda were issued subsequently and all of these documents can be found below.
RFQ Addendum No. 02 (issued April 4, 2007) |
Cover Letter |
Request for Qualifications (RFQ) |
Question and Answer (Q&A) No. 01 |
RFQ Addendum No. 01 (issued March 9, 2007) |
Cover Letter |
Request for Qualifications (RFQ) |
RFQ Original (issued December 29, 2006) |
Request for Qualifications (RFQ) |