Project description

The bridge replacement at the crossover of FM 3419 includes the removal of the current main lane bridge and the construction of a new structure. This project is a part of multiple projects on the I-30 Corridor in Bowie County. It will consist of one 12-foot mainlane in each direction, one 16-foot flush median, two 10-foot shoulders, and five-foot sidewalks in each direction. New intersections will also be included with the bridge replacement. The new roadway will be designed to enhance safety and improve mobility for motorists by providing adequate sight distance at the frontage road intersections both north and south of I-30. The new bridge will also accommodate the freight corridor clearance of 18.5 feet over I-30.

Funding & letting information

The I-30 Bridge Replacement at FM 3419 project is estimated to cost $11.4 million. The projected let date is September 2026.

I-30 at FM 3419 existing typical section
I-30 at FM 3419 proposed typical section

Public involvement

The purpose of public involvement is to share project information and updates, present proposed schematics of the project, and collect input from the community. TxDOT is committed to working closely with the community on this project. To view the virtual public meeting and meeting materials, click on the following link: Tuesday, June 14, 2022.

Downloads