Virtual Public Meeting – I-30 at FM 3419 Bridge Replacement in Bowie County
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


Where:

Use the picture link below to be guided through the virtual public meeting room where you view project information and get information on how to comment. The same information is listed below in the Downloads section.

*Click on the image below.

When:

Tuesday, June 14, 2022, 12 p.m.

Purpose:

TxDOT will be conducting a virtual public meeting to present improvements to the proposed I-30 at FM 3419 Bridge Replacement project in Bowie County.

Description:

The bridge replacement at the crossover of FM 3419 includes removal of the current main lane bridge and construction of a new structure. It will consist of one 12-foot mainlane in each direction, one 16-foot flush median, two 10-foot shoulders, and five-foot sidewalks in each direction. New intersections will also be included with the bridge replacement. The new roadway will be designed to enhance safety and improve mobility for motorists by providing adequate sight distance at the frontage road intersections both north and south of I-30. The new bridge will also accommodate the new freight corridor clearance of 18.5 feet over I-30.

Comments must be submitted via mail or e-mail on or before Wednesday, June 29, 2022, to be included in the official public record. To submit a comment by mail, send it to the TxDOT Atlanta District Office, Attention: Katie Martin, P.E., 701 E. Main St., Atlanta, TX 75551. For additional information, please contact Katie Martin, P.E. by phone at 903-799-1342.

Link to the Virtual Room:

On the date and time listed above, the link provided will direct you to the virtual room. This website will provide a narrative that describes each of the study materials. There will also be an option to send comments from the site directly to TxDOT, or you can download a PDF of the comment card for mailing or email. If you have questions, please contact Katie Martin at 903-799-1342.

Special Accommodations:

The virtual public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact Katie Martin, P.E., Atlanta District, at (903) 799-1342 no later than 4 p.m. CT, Thursday, June 9, 2022. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.

Memorandum of Understanding:

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23. U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019 and executed by FHWA and TxDOT.

Contact:

TxDOT Atlanta District
701 E. Main St.
Atlanta, TX 75551
(903) 799-1342
Email

Posted: May 26, 2022

 

Copyright 2022  •  Texas Department of Transportation  •  All Rights Reserved  •  Disclaimer  •  Privacy & Security Policy  •  Accessibility
125 East 11th Street  •  Austin, Texas 78701