Interstate 30 provides an important west-east connection for travel and trade. As the Interstate System ages, and population and trade increases in Texas, it is necessary to improve mobility and safety along this corridor. The Atlanta District is planning for several improvements to the mobility and safety aspects of the roadway along the I-30 Corridor in Bowie County. The project listed below as the I-30 Widening Project includes the widening of I-30 from a four-lane divided interstate to a six-lane divided interstate from 0.6 mile west of FM 989 to the Arkansas State Line.

Future construction projects will be posted on this page.

Corridor Projects

I-30 Widening Project: Four Lane to Six Lane

CSJ: 0610-07-113

project corridor

This project consists of widening of I-30 from 0.6 mile west of FM 989 to the Arkansas state line to improve mobility and enhance safety. The approximate 6-mile project includes:

  • Widening the existing roadway from four-lanes to six-lanes to include three 12-foot-wide travel lanes with 10-foot-wide inside and outside shoulders in each direction and a continuous concrete median barrier separating eastbound and westbound traffic
  • Replacing the existing mainlane bridges over the Kansas City Southern Railroad
  • Reconstructing existing asphalt pavement with continuously reinforced concrete pavement