Virtual Public Meeting - SH 302 from US 285 to FM 2019
Skip to main content

Virtual Public Meeting - SH 302 from US 285 to FM 2019

Where:

Use the picture link below to be guided through the virtual public meeting room where you view project information and get information on how to comment. The same information is listed below in the Downloads section.

*Click on the image below.

When:

The virtual public meeting will begin at noon on Tuesday, Aug. 31, 2021, and will be available until 11:59 p.m. on Thursday, Sept. 16, 2021.

Purpose:

TxDOT is hosting a virtual public meeting for proposed improvements to State Highway 302 from U.S. Highway 285 to Farm-to-Market 2019 near Notrees, Texas. The project is located in Reeves, Loving, Winkler and Ector counties, Texas.

The virtual meeting will consist of a virtual room and will include visual components and an opportunity to comment. Comments must be received or postmarked on or before Thursday, Sept. 16, 2021, to be a part of the official meeting record.

If you need additional information, please call the project team at (432) 203-6153 to ask questions about the project and access project materials at any time during the project development process. 

Description:

The proposed project consists of widening SH 302 from a two-lane undivided roadway consisting of 12-foot-wide travel lanes (one lane in each direction) with six-foot-wide outside shoulders to a four-lane divided highway consisting of 12-foot-wide travel lanes (two in each direction) with four-foot-wide inside and 10-foot-wide outside shoulders, in each direction. The proposed project is approximately 59 miles long. The proposed project could involve construction in wetlands or floodplains; however, that has not been determined.

How to Make a Comment:

Please provide your comment in one of the following ways:

  • Online: No longer active
  • Email: SH302@blantonassociates.com
  • Verbal Comments: Call and leave voicemail at (432) 203-6153
  • Mail: Downloadable Comment Form (English/Español)
    Blanton & Associates
    Attn: SH 302 from US 285 to FM 2019
    5 Lakeway Centre Court, Suite 200
    Austin, TX 78734 

Comments must be received or postmarked by Thursday, Sept. 16, 2021, to be included in the official record of the virtual public meeting.

Special Accommodations:

The virtual public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting, please call (432) 203-6153 no later than 4 p.m. CT, Thursday, Aug. 26, 2021. Please be aware that advance notice is required as some services and accommodations may require time for the Texas Department of Transportation to arrange.

Memorandum of Understanding:

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23. U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by FHWA and TxDOT.

Contact:

TxDOT Odessa District
3901 E. Highway 80
Odessa, TX 79761
(432) 332-0501
Email

Posted: Aug. 12, 2021