I-35 Northeast Expansion South Project – Request for Qualifications
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


TxDOT is seeking qualifications statements (QS) from teams interested in entering into a Design-Build Contract (DBC) in response to a Request for Qualifications (RFQ) to design, construct, and potentially maintain the I-35 Northeast Expansion (NEX) South Project, in Bexar County along I-35 from I-410 South to I-410 North, including transitions along I-35 from Petroleum Drive to I-410 South, and along the portion of I-410 South from I-35/I-410 South Interchange to 0.3 miles north of Seguin Road/FM 78.

TxDOT held a Procurement Industry Workshop on April 7, 2022, at 2:00 pm (CT) with industry partners for the I-35 NEX South Project in advance of RFQ issuance. TxDOT welcomed this opportunity to have a meaningful discourse with all potential Proposers concerning TxDOT’s approach to the procurement and implementation of its business opportunity programs. Attendance was not mandatory and interested parties will remain eligible to submit a QS if they did not attend the workshop.

Legal Disclaimer – The following documents are provided as reference information only project documents. The information contained in these documents reflects information as of any date or time identified therein. TxDOT has not determined whether the project documents are accurate, complete, pertinent, or of any other value to potential design-build contractors. TxDOT makes no representation, warranty or guarantee as to, and shall not be responsible for, the accuracy, completeness, or pertinence of the project documents, and, in addition, shall not be responsible for any interpretations thereof or conclusions drawn therefrom. The statements made in the project documents that are not purely historical are forward-looking statements, including TxDOT's hopes, intentions or strategies regarding the future. These statements are based on information currently available to TxDOT and TxDOT assumes no obligation to update any such forward-looking statements.

RFQ Documents - I-35 Northeast Expansion South Project  Format
Cover Letter
Minute Order
RFQ Issued Document (04/15/22)
Design-Build Contract (DBC) Term Sheet
Capital Maintenance Contract (CMC) Term Sheet
Forms
Reference Information Documents
Addendum 1 – Issued 05/12/22 Format
Cover Letter
Addendum 1
Addendum 1 Redline
DBC Term Sheet Addendum 1
DBC Term Sheet Addendum 1 Redline
CMC Term Sheet Addendum 1
CMC Term Sheet Addendum 1 Redline
Forms
Question and Answers (Q&A) Form
Addendum 2 – Issued 06/02/22 Format
Cover Letter
Addendum 2
Addendum 2 Redline
DBC Term Sheet Addendum 2
DBC Term Sheet Addendum 2 Redline
CMC Term Sheet Addendum 2
CMC Term Sheet Addendum 2 Redline
Forms
Addendum 3 – Issued 06/16/22 Format
Cover Letter
Addendum 3
Addendum 3 Redline
Q&A Matrix Format
Matrix #1 – 05/12/22
Matrix #2  – 06/16/22
Industry Workshop Documents (04/07/22) Format
Invitation
Workshop Presentation
Workshop Attendee List