Odessa
Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Description |
District-wide | Permian Promise | The Permian Promise is a Texas Transportation Commission sponsored program that was developed to help address the transportation needs throughout the Permian Basin. |
Odessa | Odessa Loop 338 Corridor Study | The goal of this study is to understand future improvements that may be needed on Loop 338. |
Odessa | Permian Basin Regional Freight and Energy Sector Transportation Plan | Identify freight activities, opportunities, challenges and strategies in the region. |
I-20 Odessa-Midland Corridor Study | I-20 | The corridor study focuses on the stretch of I-20 in the Odessa-Midland area from FM 1936 to near FM 1208, a distance of approximately 40 miles. |
Priority Corridors | Utility Coordination | The annual utility coordination update meeting provides utility owners and operators an update on TxDOT’s four-year construction plan that might affect utility installations that are on or near TxDOT’s right of way. |
Proposed District Projects | Proposed 4-year Project Letting Schedule | Maps and letting schedules that show the proposed four-year letting schedule for the Odessa District of TxDOT. |
Ward County | FM 516 | TxDOT is proposing to reconstruct and widen FM 516 from 1.7 miles west of CR 157 to 0.05 miles south of CR 137. |