Where:

The pre-recorded video presentation (in English and Spanish) will be posted below and all materials are available separately under the Downloads section.

When:

The pre-recorded presentation will be posted on this pageonThursday, July 15, 2021, at 4 p.m.

Purpose:

The purpose of the virtual public meeting is to present the proposed project to the public and receive comments. The project proposes design changes along of SH 3 from I-45 to the Galveston County line in Harris County, Texas. The virtual meeting will consist of a narrated pre-recorded presentation by the project team, project exhibits and other information, and an opportunity to comment. Comments must be received on or before Friday, July 30, 2021, to be a part of the official meeting record.

English presentation

Spanish presentation

Description:

The project is proposing to make minor modifications to the existing medians from I-45 to Richey Street. The project would replace the continuous two-way left turn lane along SH 3 from Richey Street to the Galveston County line with raised medians. These raised medians would include left turn lanes in both directions to provide access to the cross-connecting roadways throughout the project area. No displacements are anticipated for this proposed project.

Special Accommodations:

TxDOT makes every reasonable effort to accommodate the needs of the public. The virtual public meeting materials and exhibits will be in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call TxDOT’s Public Information Office at (713) 802-5076 no later than 4:00 p.m. on Monday, July 12, 2021, to request special accommodations. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.

Memorandum of Understanding:

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by FHWA and TxDOT.

Contact:

Reference the following project numbers: CSJ 0051-02-108

TxDOT Houston District Public Information Office

P.O. Box 1386

Houston, Texas 77251

713-802-5076

Email

Posted: June 28, 2021