I-45 North Walker County Project (Segment 3)
Skip to main content

I-45 North Walker County Project (Segment 3)

Public meeting

In-person: Thursday, May 16, 2024, from 4:30 p.m. to 6:30 p.m.

Roundabout Visualization
Public comment deadline Comments must be received on or before Monday, June 3, 2024, to be a part of the official public meeting record.
Meeting details Thursday, May 16, 2024
4:30 p.m. to 6:30 p.m.
Walker County Storm Shelter
455 Highway 75
Huntsville, TX 77320

Attendees will be able to come and go as they please to review project displays and ask questions of TxDOT staff in an open house format. 
Purpose The Texas Department of Transportation – Bryan District is proposing improvements to Interstate 45 (I-45) from 2.1 miles south of FM 1696 to 0.8 miles north of FM 2989 in Walker County, Texas. The purpose of the meeting is to present the proposed project and receive public comment. 
Description

The proposed project would update approximately 11 miles of I-45 in Walker County between Huntsville and Madisonville to current design standards, increase the roadway’s capacity to accommodate future traffic volumes, and improve access for local travelers. The improvements include adding one main lane in each direction, adding one-way frontage roads on both sides of the main lanes south of FM 1696, and replacing bridges and increasing vertical clearance to accommodate freight traffic.

Although additional right-of-way would be required, no residential or non-residential structures are anticipated to be displaced at this time. Information concerning services and benefits available to affected property owners and information about the tentative schedule for right-of-way acquisition and construction can be obtained from the TxDOT Bryan District Right-of-Way Office by calling (979) 213-7591.

The proposed project would involve construction in wetlands and would involve an action in a floodplain.

Accessibility The public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or have difficulty communicating in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or are a person with a disability who requires an accommodation to attend and participate in the public meeting, please contact, Bryan District Public Information Officer, at (979) 778-9764 no later than 4 p.m. CT, Thursday, May 9, 2024. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Meeting materials
How to make a comment

Comments from the public regarding the proposed project are requested and may be submitted by any of the methods listed below.

  • Email
  • Online comment form
  • Mail:
    I-45 North Walker County Project
    c/o HDR, Inc.,
    17111 Preston Road, Ste. 300, 
    Dallas, TX 75248.

All comments must be received or postmarked by Monday, June 3, 2024, to be included in the official record.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this study are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.

Posted: Apr. 16, 2024