The TxDOT Yoakum district is proposing to reconstruct and widen the existing I-10 roadway from US 90 (Alleyton Road South) to SH 71 in Columbus, in Colorado County, Texas.
The existing roadway consists of a four-lane facility with two-lane, two-way frontage roads. The median is a flush grassy median with a cable barrier system.
Proposed Improvements
Additional Information
The proposed project would require approximately 84.54 acres of additional ROW and would potentially result in 1 commercial displacement and 3 ancillary/outbuilding displacements. No residential displacements are anticipated.
Next Steps
Public Involvement
This project is Segment II of the I-10 from SH 71 to FM 2761 project and Segment II includes the US 90 (Alleyton Road South) to SH 71 in Columbus project limits.
Downloads
Contact
Reference the following project number: 0535-08-072
TxDOT Yoakum District
403 Huck St.
Yoakum, TX 77995
(361) 293-4300
Copyright 2021
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701