On October 6, 2009, TxDOT executed a comprehensive development agreement (CDA) with NorthGate Constructors, J.V., to develop, design and construct the DFW Connector.
On May 26, 2009, TxDOT held two public hearings concerning the disclosure of financial information for the DFW Connector Comprehensive Development Agreement. The public hearing summary and analysis report is now available for review.
On March 26, 2009, the Texas Transportation Commission conditionally selected NorthGate Constructors JV to design and build additional lanes along the State Highway (SH) 114/SH 121 corridor, known as the DFW Connector.
Book 1 - Comprehensive Development Agreement (Executed Version)
Exhibit |
Title |
PDF |
|
Comprehensive Development Agreement (Executed Version) |
 |
1 |
Abbreviations and Definitions |
 |
2 |
Developer’s Proposal Commitments and ATCs |
 |
3 |
Federal Requirements |
 |
4 |
TxDOT-Provided Approvals |
 |
5 |
Maximum Payment Schedule |
 |
6 |
TxDOT’s Disadvantaged Business Enterprise (DBE) Special Provisions |
 |
7 |
Developer’s DBE Performance Plan |
 |
8 |
Developer’s Job Training / Small Business Mentoring Plan |
 |
9 |
Performance Bond |
 |
10 |
Payment Bond |
 |
11 |
Retainage Bond |
 |
12 |
Warranty Bond |
 |
13 |
Form of Guaranty |
 |
14 |
Insurance Coverage Requirements |
 |
15 |
Form of Draw Request and Certificate |
 |
16 |
Form of Change Order |
 |
17 |
Liquidated Damages for Lane Closures |
 |
18 |
Initial Designation of Authorized Representatives |
 |
19 |
List of Reference Information Documents |
 |
20 |
Disputes Board Agreement |
 |
21 |
Progress Payment Certificate |
 |
Book 2 - DFW Connector Technical Provisions
Attachments |
Title |
PDF |
|
DFW Connector Technical Provisions |
 |
1-1 |
Interim Design for SH 114 Transition Provisions |
 |
1-2 |
Interim Transition for SH 114 |
 |
1-3 |
Configuration 1 Description |
 |
1-4 |
Configuration 1 Preliminary Diagrammatic Layout |
 |
1-5 |
Configuration 2 Description |
 |
1-6 |
Configuration 2 Preliminary Diagrammatic Layout |
 |
1-7 |
Deferred Work Components |
 |
2-1 |
Project Management Plan Components |
 |
2-2 |
TxDOT Test Form Fields |
 |
6 |
Utility Forms |
 |
8-1 |
One Direction Design ESALs for Mainlanes, Frontage Roads, and Select Cross Roads |
 |
15-1 |
TxDOT Fort Worth District Landscaping and Aesthetics Master Plan |
 |
16-1 |
Vehicle and Pedestrian Counts Procedure |
 |
16-2 |
Illumination Levels |
 |
17-1 |
Statewide Special Specification 6025 |
 |
17-2 |
Statewide Special Specification 1238 |
 |
Book 3 - Programmatic Technical Provisions for Design-Build (Executed Version)
Title |
PDF |
Programmatic Technical Provisions for Design-Build (Executed Version) |
 |
Capital Maintenance Agreement (Executed Version)
Exhibit |
Title |
PDF |
|
Capital Maintenance Agreement (Executed Version) |
 |
1 |
Abbreviations and Definitions |
 |
2 |
Maintenance Specification |
 |
3 |
Maintenance Contractor’s Proposal Commitments |
 |
4 |
Maintenance Price |
 |
5 |
Job Training and Small Business Mentoring Plan |
 |
6 |
Form of Maintenance Performance Bond |
 |
7 |
Form of Maintenance Payment Bond |
 |
8 |
Form of Retainage Bond |
 |
9 |
Form of Guaranty |
 |
10 |
Insurance Requirements |
 |
11 |
Maintenance Form of Draw Request and Certificate |
 |
12 |
Form of Change Order |
 |
13 |
Authorized Representative |
 |
14 |
List of Reference Information Documents |
 |
15 |
Disputes Board Agreement |
 |
Exhibit 2, Appendix 3: Schematics
Title |
PDF |
Roll 1 |
 |
Roll 2 |
 |
Roll 3 |
 |
Roll 4 |
 |
More Information