Project Description

Interstate 345 (I-345) is located on the east side of Downtown Dallas and carries traffic between I-30, US 75/I-45 and Woodall Rodgers Freeway (Spur 366). More than 180,000 vehicles use the 1.4-mile roadway every day.

The Texas Department of Transportation is facilitating a feasibility study of I-345. This study is just the beginning of a thoughtful process that will help TxDOT determine the best way to address the needs of the roadway and the traveling public as they plan for current and future development.

The feasibility study team will use a four-phase approach that will:

  • Define the project approach;
  • Develop and screen concepts;
  • Refine reasonable alternatives; and
  • Deliver collaborative and defendable study results.

The study team will collect, review and evaluate traffic counts and patterns; safety data; signal timing; current plans for committed transportation improvements in the study area; potential impacts to the local street grid and existing transportation infrastructure; and pedestrian, bicyclist, transit and freight activity data. Traffic data will be one of the major components of the study and will include traffic counts, trip origin and destination information. The team will also identify potential environmental constraints that would be taken into consideration during the feasibility study and that may need to be addressed during the environmental phase of the project.

This study will also take into consideration ideas generated through the Dallas CityMAP process and previous studies. Dallas CityMAP examined the major interstates surrounding and entering downtown Dallas and how they could best integrate with the future vision of the city.

TxDOT will work closely with the City of Dallas, Dallas County, the North Central Texas Council of Governments and other agencies and stakeholders (residents, businesses, property owners, elected and public officials, neighborhood associations, etc.) during the study process to work towards finding solutions for I-345.

Schedule and funding have not been identified for this project. Projects must go through a multi-year feasibility and environmental review process. If any changes are proposed for the roadway, they will need to be placed in the region’s current mobility plan, accounted for in local transportation plans and funding identified. 

Public Involvement

Effective public involvement provides opportunities for the public to provide input into TxDOT’s decision-making processes.  Initially, public meetings will be held in December 2019 to provide the public with preliminary information about the project and to ask for feedback, including the identification of environmental constraints and/or issues that need to be addressed during the environmental analysis.

Please take a few minutes to take our interactive online survey, which will be available until Friday, Dec. 20, 2019:

Take the survey - click to begin

Upcoming Public Meetings

Monday, Dec. 2
6 – 8 p.m.
Formal presentation at 7 p.m.
St. Philip’s School and Community Center
1600 Pennsylvania Ave.
Dallas, Texas 75215
Served by DART bus route 002.

Tuesday, Dec. 3
6 – 8 p.m.
Formal presentation at 7 p.m. CityPlace Conference Center
Lakewood Room, first floor
2711 N. Haskell Ave.
Dallas, Texas 75204
Complimentary parking provided in the CityPlace underground parking garage C. Served by DART red, blue and orange lines at the CityPlace/Uptown Station and bus routes 036, 409 and 521

Thursday, Dec. 5
10 a.m. – 8 p.m.
Formal presentations at noon, 4:30 p.m. and 7 p.m.
Sheraton Dallas Hotel
Dallas Ballroom
400 N. Olive St.
Dallas Texas 75201
Complimentary parking provided in the Sheraton garage. Served by DART red, blue, green and orange lines at the Pearl Street Station and bus routes 024, 036, and 084.

In addition to these meetings, there will be several opportunities for the public to engage in the study including surveys and public comment periods to provide feedback.

Downloads

The environmental review, consultation, and other actions required by applicable Federal Environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a memorandum of understanding (MOU) dated December 16, 2014, and executed by Federal Highway Administration (FHWA) and TxDOT.

Contact Us

Travis Campbell, P.E.
TxDOT Dallas District
4777 E. Highway 80
Mesquite, Texas 75150
214-320-6100
345study@txdot.,gov