Dallas
Skip to main content

Dallas

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

LocationProjectDescription
DallasDFW Pedestrian Safety Action PlanTxDOT policy considers pedestrians and bicyclists in the development of transportation projects.
DallasI-345 Feasibility StudyStudy to determine potential needs for the roadway.
DallasI-635 LBJ East (US 75 to I-30)Full re-construction and widening of I-635 from US 75 to I-30, including the I-30 Interchange
Dallas CountyI-635 over Seagoville RoadAccelerated Bridge Construction - COMPLETED
Dallas/DentonI-35EProposed improvements to I-35E from I-635 to US 380
KaufmanSH 34 Feasibility StudyFeasibility and alignment study on SH 34 from FM 2578 in Terrell to SH 243 in Kaufman