I-35 & I-10 downtown repairs

TxDOT is moving forward with a construction project to repair portions of I-35 and I-10 in downtown San Antonio. The project includes $25.9 million of improvements to increase safety along 5.5 miles of the corridor on I-35 from S. Laredo St. to I-37/Camden St. and on I-10 from I-35 to Hildebrand Ave.

Improvements

The project includes the following improvements:

  • Roadway resurfacing
  • Structure repairs
  • Bridge joint replacements
  • Demolition and reconstruction of the I-35 exit ramp to Brooklyn Ave./McCullough Ave

Timeline

The project will be completed in phases beginning in May 2023 and is estimated to be completed in Fall 2025. Some phases may be performed simultaneously.

Phase Type of Work Location Status
Phase 1 Bridge joint repairs Westbound I-10 upper level from Frio St. to Fulton Ave. Complete
Phase 2 Bridge joint repairs Eastbound I-10 upper level from Fulton Ave. to Frio St. In progress
Phase 3 Bridge joint repairs Southbound I-35 from Martin St. to Laredo St. Not started
Phase 4 Bridge joint repairs Northbound I-35 from Laredo St. to Martin St. Not started
Phase 5 Bridge joint repairs Northbound I-35 upper level from Flores St. to Camden St. Not started
Phase 6 Bridge joint repairs Southbound I-35 upper level from Camden St. to Flores St. Not started
Phase 7 Bridge joint and rail repairs Finesilver curve at I-35 and I-10 Not started

I-35 Exit Ramp #157B to Brooklyn Ave./McCullough Ave.

This project includes work to demolish and rebuild the I-35 exit ramp to Brooklyn Ave/McCullough Ave. Construction on this portion of the project is scheduled to begin at the end of May 2024 and is scheduled to be completed by fall 2024. Once complete, these improvements will allow the exit ramp to reopen to traffic.

This work requires the long-term closure of the southbound I-35 frontage road (E. Elmira St.) from Atlanta Ave. to Brooklyn Ave. Erie Ave. will also be closed to through traffic. Garbage pickup access will be maintained at the corner of Erie Ave. and Euclid Ave.

Frontage road traffic will be detoured through Atlanta Ave., to Euclid Ave. and travel to Brooklyn Ave. to access the frontage road.

Construction

Throughout construction, drivers will experience temporary traffic shifts and lane closures. When lane closures are scheduled, advance notice will be given to the public.

Work is anticipated to take place on weekdays, generally from 8 a.m. to 5 p.m., Monday through Friday. Occasional night-time work will be performed to limit impacts to traffic. Weekend and extended closures may be needed when major construction operations are taking place. Visit www.DriveTexas.org for the latest road conditions.