I-10 Collector-Distributor Lanes
The proposed project would construct collector-distributor lanes and improvements to the I-10 and US 85 interchange. Total project length is approximately 5.75 miles between SH 20 (Mesa Street) and Executive Center Boulevard.
Proposed improvements
- New lanes along both sides of I-10
- Improved connectors at Resler Drive and Sunland Park Drive
- Interchange improvements at Mesa Street, Sunland Park Drive and Executive Center Boulevard
Aug. 13, 2014 |
Project Overview |