FM 102 From I-10 to 0.66 miles south of FM 949
Skip to main content

FM 102 From I-10 to 0.66 miles south of FM 949

In-person public meeting with virtual option

In-person: Thursday, Jan. 9, 2025 from 4:30 - 6:30 p.m.

Virtual: Thursday, Jan. 9, 2025, at 4:30 p.m. through Friday, Jan. 24, 2025

Virtual public meeting presentations

Public comment deadline All comments must be received on or before Friday, Jan. 24, 2025.
Open house details

Thursday, Jan. 9, 2025
4:30 - 6:30 p.m.
Columbus High School Cafeteria
103 Cardinal Lane
Columbus, TX 78934

The in-person option will be held in an open house format. In-person attendees will be able to view the same presentation delivered in the virtual online public meeting which will be playing on a screen, review hard copies of project materials, ask questions to TxDOT staff and/or consultants, and leave written comments.

Virtual details

The virtual option will consist of a pre-recorded video presentation and will include both audio and visual components. The presentation will be posted online by 4:30 p.m. on Thursday, Jan. 9, 2025, on this webpage.

If you do not have internet access, you may contact the project manager at (361) 293-4328 Monday through Friday, to ask questions and access project materials during the project development process.

Purpose TxDOT is proposing to widen and realign a 6.4-mile section of FM 102 from I-10 to 0.66 miles south of FM 949 in Colorado County, Texas.
Description

The proposed project would enhance safety and bring the roadway into compliance with current design standards. The corridor would maintain its existing two-lane footprint while widening the shoulders and rehabilitating existing curves. A typical slope ditch is proposed along both sides of FM 102 to accommodate drainage, along with various culvert replacements and improvements. The proposed project would involve construction in wetlands and involve an action in a floodplain.

The proposed project would, subject to final design considerations, require additional right of way and potentially displace one residence.

Accessibility

The in-person public meeting and virtual option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the in-person public meeting or virtual option, please the Public Information Officer, TxDOT Yoakum District, at (361) 293-4436 no later than 4 p.m. CT, Monday, Jan. 6, 2025. Please be aware that advance notice is required as some services and accommodations may require time for the Texas Department of Transportation to arrange.

El public meeting se llevará a cabo en inglés. Si usted necesita un intérprete o un traductor de documentos porque su idioma principal no es el inglés o tiene alguna dificultad para comunicarse eficazmente en inglés, se le proporcionará uno. Si usted tiene alguna discapacidad y necesita ayuda, se pueden hacer arreglos especiales para atender la mayoría de las necesidades. Si usted necesita servicios de interpretación o traducción o usted es una persona con alguna discapacidad que requiera una adaptación para asistir a y participar en public meeting, por favor póngase en contacto al número (361) 293-4436 a más tardar a las 4 p.m. hora central, Lunes, 6 de enero de 2025. Por favor sepa que es necesario dar aviso con anticipación, ya que algunos servicios y adaptaciones pueden requerir tiempo para que TxDOT los organice.

Meeting materials

Schematics

  • Schematic 1 - FM 102 from South og I-10 to South of Greek Ranch Road
  • Schematic 2 - FM 102 from South of Greek Ranch Road to Nroth of Gravel Pit Road
  • Schematic 3 - FM 102 from North of Gravel Pit Road to South FM 949

Right of way information

How to make a comment

Submit comments via any of the following ways:

  • Email as shown in the notice
  • By mail: TxDOT Yoakum District Office 403 Huck Street Yoakum, TX 77995

All comments must be received on or before at least Friday, Jan. 24, 2025. Responses to comments received will be on file and available for inspection at the TxDOT Yoakum District Office once they have been prepared.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: Dec. 4, 2024