FM 1570 from I-30 to SH 66
Skip to main content

FM 1570 from I-30 to SH 66

Notice and opportunity to comment

Public comment deadline All comments must be received on or before Thursday, Sept. 15, 2022.
Purpose TxDOT Paris District is proposing to widen and improve FM 1570 from I-30 to SH 66 and from I-30 to SH 34 in Hunt County, Texas.
Description

The project includes roadway improvements along approximately 3.1 miles of FM 1570 from IH 30 to SH 66, and along approximately 2.4 miles of FM 1570 from IH 30 to SH 34 in Greenville, Texas. The existing facility is a rural roadway with two 12-foot travel lanes and two 10-foot shoulders with open drainage ditches. The preferred roadway section has been identified as featuring a four-lane, curb and gutter roadway with a two-way left turn lane and shared use paths to generally fit within the existing 100’ right-of-way. No additional ROW is anticipated; however, the proposed improvements would require approximately two acres of permanent drainage easements. The proposed improvements also include the regrading of existing drainage easements.

Although additional permanent drainage easements would be required, no residential or non-residential structures are anticipated to be displaced at this time.

You may submit written comments on this project. Written comments may be submitted by mail to TxDOT Paris District Office, 1365 North Main Street, Paris, Texas 75460 or by email to address on notice below.

Meeting materials

North Schematics

South Schematics

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: Aug. 8, 2022