US 285 North – Project 3
Skip to main content

US 285 North – Project 3

From RM 652 to 0.1 mile south of the New Mexico State Line

Notice and opportunity to comment

Public comment deadline All comments must be received on or before Friday, Aug. 9, 2024.
Purpose The Texas Department of Transportation (TxDOT) Odessa District is proposing improvements to US 285 from RM 652 to 0.1 mile south of the New Mexico state line in Reeves and Culberson counties, Texas. This notice is affording an opportunity to comment as part of the environmental review process for this project.
Description

The proposed project would include widening approximately 11 miles of US 285 to a four-lane divided highway with two lanes in each direction, as well as both inside and outside shoulders. The existing right-of-way (ROW) width ranges from approximately 150 – 200 feet, while the proposed ROW width would range from approximately 237 – 360 feet. Improvements would include a wide center median and/or barrier with median openings and turn lanes as needed.

The proposed project would, subject to final design considerations, require additional right of way and potentially displace no residences and one non-residential structure. Relocation assistance is available for displaced persons and businesses. Information about the TxDOT Relocation Assistance Program and services and benefits for those displaced and other affected property owners, as well as information about the tentative schedule for right-of-way acquisition and construction, can be obtained from the TxDOT district office by calling 432-498-4645.

Any environmental documentation or studies, maps and drawings showing the project location and design, tentative construction schedules, and other information regarding the proposed project are on file and available for inspection Monday through Friday between the hours of 8 a.m. and 5 p.m. at the TxDOT Odessa District office 3901 E. Highway 80, Odessa, TX 79761. Project materials are also available online on this webpage.

Accessibility

The project materials are written in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to review the project materials or submit information, please contact the public information officer at 432-498-4746 no later than 4 p.m. CT, at least three business days before the date on which you would like to review the project materials or submit information. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.

Los materiales del proyecto están escritos en inglés. Si usted necesita un intérprete o un traductor de documentos porque su idioma principal no es el inglés o tiene alguna dificultad para comunicarse eficazmente en inglés, se le proporcionará uno. Si usted tiene alguna discapacidad y necesita ayuda, se pueden hacer arreglos especiales para atender la mayoría de las necesidades. Si usted necesita servicios de interpretación o traducción o es una persona con alguna discapacidad que requiera una adaptación para revisar los materiales o enviar información, por favor póngase en contacto 432-498-4746 a más tardar a las 4:00 p.m. hora central, al menos tres días hábiles antes de la fecha en la que desea revisar los materiales del proyecto o enviar información. Por favor, tenga en cuenta que se requiere aviso previo ya que algunos servicios y adaptaciones pueden requerir tiempo para que TxDOT los organice.

Additional information
How to make a comment

*Please note that the comment period for this meeting is closed.

Written comments may be submitted by mail or email. All comments must be received on or before Friday, Aug. 9, 2024.

Mail: Jacobs Engineering Attn: Chris Hoff, P.E. 1999 Bryan St., Suite 3500 Dallas, TX 75201

Email: US285North@Jacobs.com

If you have any general questions regarding the proposed project, please contact the advanced planning engineer, at 432-498-4645 or by email as shown in the notice.

Memorandum of Understanding

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.

Posted: July 22, 2024