Public Meeting - US 59 South/610 West Interchange
Skip to main content

Public Meeting - US 59 South/610 West Interchange

Where: Houston Community College
Southwest Campus
 5601 West Loop South
When: Wednesday, April 18, 2012
 5:30 p.m. - 7:30 p.m.
Purpose: Gather public input on proposed reconstruction of the US 59 South/610 West Interchange.
 
Description: The interchange improvements are planned to take place in three phases, consisting of the following:

Phase One
  • Construct IH 610 SB to US 59 NB Connector (CSJ 0271-17-145)
  • Construct IH 610 NB to US 59 SB Connector (CSJ 0271-17-146)
  • Construct US 59 NB to IH 610 SB Connector (CSJ 0027-13-206)
  • Construct Westheimer Ramp to US 59 SB
  • Construct US 59 SB Exit Ramp to Chimney Rock
  • Construct Realigned Post Oak Blvd with METRO Accommodations
  • Realign IH 610 SB to US 59 SB Connector
  • Restripe IH 610 NB to US 59 NB Connector  

Phase Two

  • Reconstruct US 59 NB to IH 610 NB Connector
  • Reconstruct US 59 SB to IH 610 SB Connector  

Phase Three

  • Reconstruct IH 610 Main Lane Bridge
Downloads:
Contact:

Texas Department of Transportation
Project Manager
P.O. Box 1386
Houston, TX 77251-1386
(713) 802-5271
Email