Public Hearing: S.M. Wright Project (US 175, SH 310 and I-45)
Where: | Park South YMCA 2500 Romine Ave. Dallas, TX 75215 |
When: | Thursday, June 27, 2013 Open House: 5:30 p.m. - 6 p.m. Public Hearing Presentation: 6:30 p.m. |
Purpose: | The purpose of this public hearing is to present the revisions to the design schematic that addresses the concerns raised by citizens at the January 31, 2013 public hearing regarding proposed improvements to the S.M. Wright Freeway.
The environmental document, maps, and other drawings depicting the project location and proposed improvements will be available at the public hearing. |
||
Description: | The existing design of US 175 does not meet current urban freeway design standards, nor does it adequately accommodate current traffic demand. The proposed project would satisfy these deficiencies and future travel demand in the area. | ||
Downloads: |
|||
Contact: | Robert Hall, P.W.S., CFM TxDOT Dallas District Environmental Coordinator 4777 East Highway 80 Mesquite, Texas 75150 Phone: (214) 320-6157 |