US 79 from I-35 to east of FM 1460
Skip to main content

US 79 from I-35 to east of FM 1460

Virtual public meeting

Tuesday, Sept. 1, 2026, by 5:30 p.m. CT

Meeting details

Public comment deadline All comments must be received on or before Wednesday, Sept. 16, 2026, to be included in the public meeting documentation.
Virtual details

The public meeting materials will be posted online to this webpage on Tuesday, Sept. 1, 2026, by 5:30 p.m. CT. 

The virtual public meeting will consist of a pre-recorded video presentation and will include both audio and visual components. (no in-person public meeting).

If you do not have internet access, you may call 512-832-7000 and leave a message to ask questions or request project materials, and someone will get back to you as promptly as possible.

Purpose

TxDOT and the city of Round Rock are proposing improvements to US 79 from I-35 to east of A.W. Grimes Boulevard in Williamson County, Texas. This notice advises the public that TxDOT will be hosting a virtual public meeting.

Description The proposed improvements include widening the existing US 79 highway to add a third travel lane in each direction with a raised median and selected median breaks, constructing intersection improvements featuring grade separations at Mays Street and at A.W. Grimes Boulevard, reconfiguring the US 79 and I-35 intersection, modifying driveways and access points to improve safety and traffic flow, and installing shared-use paths on both sides of US 79 to enhance pedestrian and bicycle accommodations.
Accessibility

The virtual public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to participate in the virtual public meeting, please contact the team as shown in notice no later than 4 p.m. CT, Thursday, Aug. 27, 2026. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.

Meeting  materials
How to make a comment Written comments from the public regarding the proposed project are requested and may be submitted by: 
  • Email: ausinfo@txdot.gov
  • Mail: 
    TxDOT Austin District Office
    Attn: US 79 from I-35 to FM 1460 Project 
    7901 N. I-35
    Austin, TX 78753

All comments must be received on or before Wednesday, Sept. 16, 2026.

Memorandum of Understanding The environmental review, consultation and other actions required by applicable federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 17, 2025, and executed by FHWA and TxDOT.

Posted: Aug. 17, 2026