Open House - US 83/277 at FM 3034 Overpass
Skip to main content

Open House - US 83/277 at FM 3034 Overpass

Where:

TxDOT Abilene District Headquarters
VTC Room
4250 N. Clack St.
Abilene, TX 79601 (Map)

When:

Tuesday, Aug. 29, 2017
4-7 p.m.

Purpose:

The Texas Department of Transportation (TxDOT), in conjunction with the Abilene MPO, has identified the intersection of US 83/277 at FM 3034 as a priority for safety improvements. As part of the overall plan to improve safety and operation of the corridor, a proposed grade separation will serve to enhance the movement of traffic at the intersection of FM 3034. The proposed project is 0.9 miles in Taylor and Jones counties. Maps and schematics will be available at the meeting as TxDOT seeks input on the propose project. The meeting will be open house format so citizens may come and go at their convenience. TxDOT staff will be available to answer questions.

Description:

The proposed project will consist of building an overpass over the FM 3034 intersection. Entrance and exit ramps will be provided for access to the intersection. FM 3034 will be realigned to reduce utility conflicts and the intersection will be re-built to the north of the existing intersection. Motorists will no longer have a conflict with high speed cross traffic that will now be on the bridge structure above. This project will require the purchase of right-of-way (ROW) with no impacts to building structures. The cost of ROW acquisition and utility relocation is to be determined.

Download:

Contact:

TxDOT Abilene District
4250 N. Clack Street
Abilene, TX 79601

(325) 676-6800

Email

Posted Aug. 15, 2017