Public Meeting - I-35W from the Denton/Tarrant County Line to I-35/I-35E Interchange, Denton County
Skip to main content

Public Meeting - I-35W from the Denton/Tarrant County Line to I-35/I-35E Interchange, Denton County

Where:

Argyle Middle School
6601 Canyon Falls Drive
Argyle, TX 76226 (Map)

When:

Thursday, April 19, 2018
6 p.m. - 8 p.m.

Purpose:

The purpose of the meeting is to present the planned improvements and solicit public comments on the proposed roadway improvements to I-35W from the Denton/Tarrant County line to the I-35/I-35E interchange in Denton County, Texas. The meeting will be an open house format with no formal presentation so the public may come and go at their convenience, and staff will be available to answer questions.

Description:

The proposed project would consist of the reconstruction and widening of I-35W from the Denton/Tarrant County line to the I-35/I-35E interchange. The I-35W mainlanes would be widened from four to six lanes. Continuous four-lane frontage roads with auxiliary lanes would be added from Dale Earnhardt Way to the I-35/I-35E interchange. Existing ramps would be reconfigured and/or relocated. Cross street intersections would be upgraded to an urban style intersection and may require grade separation. Additional right of way is anticipated to be needed for the addition of the new frontage roads. Construction is anticipated to take place in phases, with frontage road improvements occurring first.

Special accommodations: TxDOT makes every reasonable effort to accommodate the needs of the public. The public meeting will be in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call (214) 320-4480 at least two working days prior to the meeting. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

Comments must be received on or before May 4, 2018, to be a part of the official meeting record.

Downloads:

Contact:

TxDOT Dallas District
Public Information Office
(214) 320-4480

Email

Posted March 19, 2018