Project background

The Texas Department of Transportation San Antonio District is proposing to improve FM 3351 from Desperado Way to SH 46, in Fair Oaks Ranch and portions of Bexar, Comal, and Kendall counties, Texas. TxDOT has been working collaboratively with the City of Fair Oaks Ranch, Bexar County, Comal County, and Kendall County to help identify corridor issues and concerns.

Project description

TxDOT is proposing to widen FM 3351 within the project limits. The proposed number of travel lanes will be determined as the project develops. As part of the project development process, various environmental studies will be conducted and the need for bicycle and pedestrian accommodations will be evaluated. The proposed typical section(s) will be based on enhanced safety and improved travel times while avoiding and minimizing environmental impacts, to the extent practicable.

Anticipated project schedule

The proposed project began in 2024 and the project schedule (tentative, subject to change) is shown below:

Anticipated Project Schedule

Public involvement

TxDOT is dedicated to creating robust public involvement opportunities that foster engagement and transparency. This ensures that the community input helps to guide the planning and decision-making process.

Proposed project updates

To receive email updates on the above proposed projects, Click Here to Opt-in. For questions on the proposed projects, please email your name and contact information to FM3351@pozcam.com. Please include “Updates on FM 3351” in the subject line.