I-20 Widening Project at FM 1788
Project overview
Current construction involves the demolition of the existing bridge on FM 1788 and the construction of a new I-20 bridge over FM 1788. With the demolition of the FM 1788 bridge, FM 1788 will cross below the I-20 mainlanes, and a new bridge will carry I-20 over FM 1788. Updated construction details include a change from hot mix asphalt to concrete pavement to extend pavement life, and localized drainage improvements to achieve positive flow.
These improvements will:
- Enhance operation and safety
- Reduce traffic congestion
- Improve roadway connectivity along the I-20 corridor
The project, which began in fall of 2026, is expected to take 12 - 14 months, with completion in early 2028.
Proposed improvements
The proposed project would include the demolition of the existing bridge on FM 1788 and the construction of a new I-20 bridge over FM 1788. Improvements would address:
- Adding additional main lanes
- Constructing new interchanges
- Reconfiguring ramps
- Converting frontage roads from two-way operation to one-way operation