Planned construction improvements
Planned improvements include the following:
- Reversing and braiding the northbound entrance and exit ramps; this means the northbound entrance and exit ramps will be reversed, and the northbound entrance ramp will go over the northbound exit ramp
- Widening northbound exit ramp to a two-lane exit ramp
- Lengthening Clear Creek frontage road bridges
- Constructing detention ponds
- Constructing noise barrier
Approximately six acres of additional right of way are required for the proposed design changes. No additional displacements are anticipated.
Next steps
- Re-evaluation determination for these design changes anticipated in Spring of 2025
Lane closure and detour information
Lane closure and detour information can be monitored by:
- Checking Houston TranStar for closure and detour information
- Checking DriveTexas.org for closure and detour information
- Following us on the TxDOT Houston Twitter site