FM 2978 at FM 2920
The scope of this study is 2.5 miles from Farm-to-Market (FM) 2978 from FM 2920 to Dobbin Hufsmith Road.
Proposed improvements
Proposed improvements include widening the roadway from 2 to 5 lanes.
Partners
This study is a partnership between TxDOT and the Federal Highway Administration.