I-35 Segment 1 from I-20 to FM 3391/East Renfro Street
Interstate I-35W background
Interstate 35W is the main north-south corridor through the cities of Fort Worth, Everman, Crowley, and Burleson in Tarrant and Johnson counties.
According to the U.S. Census Bureau, Tarrant County was ranked as the fifth fastest growing county in the United States between 2010 and 2019. This growth is the catalyst for the need to expand the existing transportation infrastructure.
Proposed benefits
The TxDOT Fort Worth district is conducting a corridor study of I-35W between I-20 and SH 174 to develop proposed improvements that would increase capacity, improve safety and mobility and ease congestion in this area.

Proposed improvements
As the study progresses, public involvement will be a key component of the project. Interested residents as well as property and business owners can provide comments throughout the study and at public meetings planned at key milestones during the project.
Get involved
The public will be able to gather information, review schematic plans, meet with TxDOT and consultant staff, ask questions and leave comments regarding the proposed design, right of way, and environmental impact during these meetings. The following is a tentative meeting schedule:
- Public Meeting #1: Virtual Public Meeting - April 27, 2021
- Public Meeting #2: Virtual public meeting with in-person option - Oct. 26, 2023
- Public Hearing: Anticipated Fall 2023
Technical working group meeting #1 - held on June 26, 2019
Schematics
- Plan 1: I-35W from North of I-20 to North of Everman Parkway
- Plan 2: I-35W from North of Everman Parkway to North of Rendon Crowley Road
- Plan 3: I-35W from North of Rendon Crowley Road to South of SH 174
- Presentation
Technical working group meeting #2- held on May 7, 2020
Schematics
- Plan 1: I-35W from North of I-20 to South of Altamesa Boulevard
- Plan 2: I-35W from South of Altamesa Boulevard to South of Everman Parkway
- Plan 3: I-35W from South of Everman Parkway to North of Garden Acres Drive
- Plan 4: I-35W from North of Garden acres Drive to North of FM 1187
- Plan 5: I-35W from North of FM 1187 to South of Alsbury Boulevard
- Plan 5 Alternative: I-35W from North of FM 1187 to South of Alsbury Boulevard
- Plan 6: I-35W from South of Alsbury Boulevard to South of SH 174
- Plan 6 Alternative: I-35W from South of Alsbury Boulevard to South of SH 174
- Plan 7: SH 174 from I-35W to Renfro Street
- Presentation
Technical working group meeting #3- held on Feb. 25, 2021
Schematics
- Plan 1: I-35W from North of I-20 to South of Altamesa Boulevard
- Plan 2: I-35W from South of Altamesa Boulevard to South of Everman Parkway
- Plan 3: I-35W from South of Everman Parkway to North of Garden Acres Drive
- Plan 4 :I-35W from North of Garden Acres Drive to North of FM 1187
- Plan 5A: I-35W/SH 174 from North of FM 1187 to Renfro Street
- Plan 5B Alternative: I-35W/SH 174 from North of FM 1187 to Renfro Street
- Plan 5C: Alternative: I-35W/SH 174 from North of FM 1187 to Renfro Street
- Presentation
Downloads
- Documentation of public meeting - Oct. 23, 2023