US 290 Intersection Improvement Project
Skip to main content
Careers Contact us

US 290 Intersection Improvement Project

Overview

The US 290 intersection improvement project will improve safety and mobility along US 290 from Gregg Manor Road to Ceder Street in Manor by adding or extending turn lanes at key intersections, making signal upgrades and repaving the roadway. More information about the improvements at each intersection can be found below.

Construction information

The improvements along US 290 will occur at three main intersections, including FM 973, Shadow Glen Boulevard and George Bush Street.

A map of the US 290 Intersection Improvement Project limits, with a stretch of US 290 highlighted from Gregg Manor Road to Cedar Street.

At FM 973

TxDOT will make the followingimprovements:

  • Add a thru-lane and a right-turn lane for westbound US 290.
  • Add another left-turn lane for both westbound and eastbound US 290.
  • Add a lane for southbound FM 973, south of US 290.
  • Make traffic signal improvements at the intersection.
An illustration of the US 290 and FM 973 intersection with markings depicting an added thru-lane and right-turn lane for westbound US 290, a left-turn lane for both westbound and eastbound US 290, and an added lane for southbound FM 973 south of US 290.

At Shadow Glen Boulevard

TxDOT will lengthen the left-turn lane and add a right-turn lane for westbound US 290.

An illustration of the US 290 and Shadow Glen Boulevard intersection with markings depicting a lengthened left-turn lane and a right-turn lane for westbound US 290.

At George Bush Street

TxDOT will lengthen the left-turn lane for eastbound US 290.

An illustration of the intersection of US 290 and George Bush Street with markings depicting a lengthened left-turn lane for eastbound US 290.