US 380 from Teel Parkway/Championship Drive to west of Lakewood Drive
Virtual public meeting with in-person option
Virtual: Tuesday, May 10, 2022 at 6 p.m. CT
In-person: Tuesday, May 10, 2022 from 6 to 8 p.m. CT
Public comment deadline | Comments must be received on or before Wednesday, May 25, 2022. |
Virtual details | The virtual public meeting will be posted here on Tuesday, May 10, 2022, at 6 p.m. and remain online through Wednesday, May 25, 2022, at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience. Additionally, TxDOT is providing an in-person meeting option for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public meeting. |
In-person details | Tuesday, May 10, 2022 6-8 p.m. Rock Hill High School Cafeteria 16061 Coit Road, Frisco, TX 75035 |
Purpose | TxDOT is proposing to widen US 380 from Teel Parkway/Championship Drive in Denton County to west of Lakewood Drive in Collin County, Texas. |
Description | TxDOT is proposing to reconstruct 5.9 miles of US 380 from Teel Parkway/Championship Drive in Denton County to west of Lakewood Drive in Collin County. The proposed project involves the full reconstruction of the existing five-lane rural roadway in Denton County and six-lane urban roadway in Collin County to a six-lane divided highway with two to three-lane continuous frontage roads. In addition to adding lanes, the proposed design includes drainage improvements, ramps to provide accessibility, interchange improvements to meet safety and/or capacity requirements, and shared use paths along both sides of the corridor. The roadway passes through the cities of Frisco, Prosper and McKinney. The existing US 380 right-of-way (ROW) width ranges from 158 to 287 feet throughout the length of the project. The proposed ROW width varies from 245 to 522 feet with a typical ROW of 336 feet. The proposed improvements would potentially require approximately 145 acres of new ROW. The proposed project would require additional ROW and potentially displace structures on commercial and/or residential properties. |
Accessibility | The public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the public meeting, please contact the Dallas District Public Information Office, at 214-320-4480 no later than 4 p.m. on Wednesday, May 4, 2022. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange. |
Meeting materials | |
Memorandum of Understanding | The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by the Federal Highway Administration and TxDOT. |
Posted: April 18, 2022