FM 6 from SH 78 to Hunt County Line
Skip to main content

FM 6 from SH 78 to Hunt County Line

Virtual public meeting with in-person option

Virtual: Thursday, October 20, 2022 at 5:30 p.m. through Friday, November 4, 2022, at 11:59 p.m.

In-person: Thursday, October 20, 2022 5:30 to 7:30 p.m.

Public comment deadline All comments must be received on or before Friday, Nov. 4, 2022.
Virtual details

The virtual public hearing will be posted here beginning Thursday, Oct. 20, 2022 at 5:30 p.m., and will remain online through Friday, Nov. 4, 2022, at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience.

Additionally, TxDOT is providing an in-person meeting for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public meeting.

In-person details Thursday, Oct. 20, 2022
5:30-7:30 p.m.
Community High School Cafeteria 
440 N FM 1138
Nevada, TX 7517
Purpose TxDOT is proposing to improve FM 6 from SH 78 to the Hunt County line, a total of approximately 7.88 miles, in Collin County, Texas.
Description

The proposed project involves:

  • The reconstruction of the existing two-lane rural roadway to a four (ultimate six) lane divided highway
  • A continuous 10-foot shared use path would be constructed on the east and west sides of the proposed roadway alignment

The proposed project consists generally of four (ultimately six) lanes with curb and gutter, plus a raised median. The roadway passes through the cities of Nevada and Josephine. The existing FM 6 right-of-way width ranges from 60-feet to 100-feet wide throughout the length of the project. The proposed ROW width is 140 feet. 

The proposed project would, subject to final design consideration, require approximately 45 acres of additional ROW and potentially displace structures on commercial and/or residential properties. Relocation assistance is available for displaced persons and businesses.

Accessibility The public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the public meeting, please contact the Dallas District Public Information Office at 214-320-4480 no later than 4 p.m., Wednesday, Oct. 12, 2022. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Meeting materials
How to make a comment Comments must be postmarked or otherwise received by Friday, Nov. 4, 2022 to: TxDOT Dallas District Office, Attn: Kibru Andargie, P.E., 4777 East Highway 80 Mesquite, Texas 75150; by email as described in the Notice
Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: Sept. 28, 2022